HHV FACILITY - EXPERIENCE IN CONSTRUCTION AND COMMISSIONING

被引:0
|
作者
HEBEL, G [1 ]
WEISKOPF, H [1 ]
TERKESSIDIS, J [1 ]
HOFMANN, W [1 ]
机构
[1] HOCHTEMP HELIUM VERSUCHSANLAGE BETRIEBSGESELL MBH JULICH,D-5170 JULICH,FED REP GER
来源
ATOMWIRTSCHAFT-ATOMTECHNIK | 1982年 / 27卷 / 05期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:258 / 262
页数:5
相关论文
共 50 条
  • [21] National Ignition Facility commissioning and performance
    Van Wonterghem, BM
    Burkhart, SC
    Haynam, CA
    Manes, KR
    Marshall, CD
    Murray, JE
    Spaeth, ML
    Speck, DR
    Sutton, SB
    Wegner, PJ
    OPTICAL ENGINEERING AT THE LAWRENCE LIVERMORE NATIONAL LABORATORY II: THE NATIONAL IGNITION FACILITY, 2004, 5341 : 55 - 65
  • [22] Facility design and expansion: Commissioning for innovation
    Yakren, MN
    BIOPHARM INTERNATIONAL, 2006, 19 (05) : 34 - +
  • [23] Commissioning of the Francium Trapping Facility at TRIUMF
    Tandecki, M.
    Zhang, J.
    Collister, R.
    Aubin, S.
    Behr, J. A.
    Gomez, E.
    Gwinner, G.
    Orozco, L. A.
    Pearson, M. R.
    JOURNAL OF INSTRUMENTATION, 2013, 8
  • [24] Commissioning and early experiments of the PHELIX facility
    Bagnoud, V.
    Aurand, B.
    Blazevic, A.
    Borneis, S.
    Bruske, C.
    Ecker, B.
    Eisenbarth, U.
    Fils, J.
    Frank, A.
    Gaul, E.
    Goette, S.
    Haefner, C.
    Hahn, T.
    Harres, K.
    Heuck, H. -M.
    Hochhaus, D.
    Hoffmann, D. H. H.
    Javorkova, D.
    Kluge, H. -J.
    Kuehl, T.
    Kunzer, S.
    Kreutz, M.
    Merz-Mantwill, T.
    Neumayer, P.
    Onkels, E.
    Reemts, D.
    Rosmej, O.
    Roth, M.
    Stoehlker, T.
    Tauschwitz, A.
    Zielbauer, B.
    Zimmer, D.
    Witte, K.
    APPLIED PHYSICS B-LASERS AND OPTICS, 2010, 100 (01): : 137 - 150
  • [25] Recent results of the commissioning of the DELTA facility
    Friedl, J
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 724 - 726
  • [26] Completion of the Commissioning of the EDIPO Test Facility
    Bruzzone, P.
    March, S.
    Stepanov, B.
    Sedlak, K.
    Wesche, R.
    Portone, A.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2016, 26 (04)
  • [27] Commissioning a museum and archival storage facility
    Ellis, RT
    ASHRAE TRANSACTIONS 1996, VOL 102, PT 1, 1996, 102 : 476 - 481
  • [28] COMMISSIONING OF A TEST FACILITY FOR CALIBRATION OF ANEMOMETERS
    VANRENSBURG, JJ
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1975, 75 (09): : 239 - 244
  • [29] Commissioning and early experiments of the PHELIX facility
    V. Bagnoud
    B. Aurand
    A. Blazevic
    S. Borneis
    C. Bruske
    B. Ecker
    U. Eisenbarth
    J. Fils
    A. Frank
    E. Gaul
    S. Goette
    C. Haefner
    T. Hahn
    K. Harres
    H.-M. Heuck
    D. Hochhaus
    D. H. H. Hoffmann
    D. Javorková
    H.-J. Kluge
    T. Kuehl
    S. Kunzer
    M. Kreutz
    T. Merz-Mantwill
    P. Neumayer
    E. Onkels
    D. Reemts
    O. Rosmej
    M. Roth
    T. Stoehlker
    A. Tauschwitz
    B. Zielbauer
    D. Zimmer
    K. Witte
    Applied Physics B, 2010, 100 : 137 - 150
  • [30] Commissioning and first results of the OLMAT facility
    Tabares, Francisco L.
    Oyarzabal, Eider
    Alegre, Daniel
    Tafalla, David
    McCarthy, Kieran J.
    de Castro, Alfonso
    Ascasibar, Enrique
    Soleto, Alfonso
    Fernandez-Berceruelo, Ivan F.
    Carrasco, Ricardo
    Martin, Fernando
    Sebastian, Jose A.
    Gomez-Manchon, Jesus
    Pereira, Augusto
    de la Pena, Angel
    FUSION ENGINEERING AND DESIGN, 2023, 187