Facility design and expansion: Commissioning for innovation

被引:0
|
作者
Yakren, MN [1 ]
机构
[1] Syska Hennessy Grp, New York, NY 10036 USA
关键词
D O I
暂无
中图分类号
Q81 [生物工程学(生物技术)]; Q93 [微生物学];
学科分类号
071005 ; 0836 ; 090102 ; 100705 ;
摘要
引用
收藏
页码:34 / +
页数:4
相关论文
共 50 条
  • [1] Design and commissioning experience of salt facility
    de Kock, M
    Venter, S
    ASTRONOMICAL STRUCTURES AND MECHANISMS TECHNOLOGY, 2004, 5495 : 247 - 257
  • [2] Design and commissioning of the ISOL beamline at the RAON facility
    Hashimoto, T.
    Kim, H. J.
    Kim, J. H.
    Park, Y. -h.
    Heo, S.
    Yoo, K. H.
    Yun, C. C.
    Ishiyama, H.
    Lee, J. H.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2024, 556
  • [3] Heavy ion accelerator facility front end design and commissioning
    Yang, Y.
    Sun, L. T.
    Zhai, Y. H.
    Zhai, Y. J.
    Shen, Z.
    Qian, C.
    Dou, W. P.
    Ma, W.
    Lu, L.
    Guo, Y. H.
    Fang, X.
    Yuan, Y. J.
    Sun, L. P.
    Yang, J. C.
    Zhao, H. W.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2019, 22 (11):
  • [4] Design and commissioning of the Beam Test Facility at the Spallation Neutron Source
    Zhang, Z.
    Cousineau, S.
    Aleksandrov, A.
    Menshov, A.
    Zhukov, A.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2020, 949
  • [5] The commissioning of the BRISOL facility
    Tang, B.
    Cui, B.
    Chen, L.
    Huang, Q.
    Ma, R.
    Ma, Y.
    Ma, X.
    Zhang, T.
    Jiang, W.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2016, 376 : 429 - 433
  • [6] Design and commissioning of an experimental facility for performance evaluation of pure and mixed refrigerants
    Molinaroli, Luca
    Lucchini, Andrea
    Pietro, Luigi
    Colombo, Maria
    36TH UIT HEAT TRANSFER CONFERENCE, 2019, 1224
  • [7] Design, Development, and Commissioning of a Multimegawatt Test Facility for Renewable Energy Research
    McKinney, Mark H.
    Fox, J. Curtiss
    Collins, E. Randolph
    Bulgakov, Konstantin
    Salem, Thomas E.
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2016, 52 (01) : 11 - 17
  • [8] Design and characterization of a hypervelocity expansion tube facility
    Dufrene, A.
    Sharma, M.
    Austin, J. M.
    JOURNAL OF PROPULSION AND POWER, 2007, 23 (06) : 1185 - 1193
  • [9] The LIL facility quadruplet commissioning
    Di-Nicola, J. M.
    Fleurot, N.
    Lonjaret, T.
    Julien, X.
    Bordenavel, E.
    Le Garrec, B.
    Mangeant, M.
    Behar, G.
    Chies, T.
    Feral, C.
    Graillot, H.
    Luttmann, M.
    Jequier, F.
    Journot, E.
    Lutz, O.
    Thiell, G.
    JOURNAL DE PHYSIQUE IV, 2006, 133 : 595 - 600
  • [10] Commissioning the DRAGON facility at ISAC
    Engel, S
    Hutcheon, D
    Bishop, S
    Buchmann, L
    Caggiano, J
    Chatterjee, ML
    Chen, AA
    D'Auria, J
    Gigliotti, D
    Greife, U
    Hunter, D
    Hussein, A
    Jewett, CC
    Laird, AM
    Lamey, M
    Liu, W
    Olin, A
    Ottewell, D
    Pearson, J
    Ruiz, C
    Ruprecht, G
    Trinczek, M
    Vockenhuber, C
    Wrede, C
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2005, 553 (03): : 491 - 500