Heuristic for network project scheduling with random activity durations depending on the resource allocation

被引:0
|
作者
Ben-Gurion Univ of the Negev, Beer Sheva, Israel [1 ]
机构
来源
Int J Prod Econ | / 2卷 / 149-162期
关键词
Number:; -; Acronym:; Sponsor: Ben-Gurion University of the Negev;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Resource–constrained project scheduling: a heuristic for the multi–mode case
    Roland Heilmann
    OR-Spektrum, 2001, 23 : 335 - 357
  • [42] A simple and effective heuristic for the resource constrained project scheduling problem
    DePuy, GW
    Whitehouse, GE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3275 - 3287
  • [43] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [44] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [45] A BASIS FOR THE DESIGN OF A MULTIATTRIBUTE HEURISTIC FOR SINGLE RESOURCE PROJECT SCHEDULING
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 21 (1-4) : 291 - 295
  • [46] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [47] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
    J. Alcaraz
    C. Maroto
    Annals of Operations Research, 2001, 102 : 83 - 109
  • [48] Multi-resource allocation in stochastic project scheduling
    Wiesemann, Wolfram
    Kuhn, Daniel
    Rustem, Berc
    ANNALS OF OPERATIONS RESEARCH, 2012, 193 (01) : 193 - 220
  • [49] A robust optimisation approach to project scheduling and resource allocation
    Adida, Elodie
    Joshi, Pradnya
    International Journal of Services Operations and Informatics, 2009, 4 (02) : 169 - 193
  • [50] CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping
    Lucas Grèze
    Robert Pellerin
    Patrice Leclaire
    Nathalie Perrier
    Journal of Intelligent Manufacturing, 2014, 25 : 797 - 811