A simple and effective heuristic for the resource constrained project scheduling problem

被引:15
|
作者
DePuy, GW [1 ]
Whitehouse, GE
机构
[1] Univ Louisville, Dept Ind Engn, Louisville, KY 40292 USA
[2] Univ Cent Florida, Orlando, FL 32816 USA
关键词
D O I
10.1080/00207540110060608
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the development and application of a simple heuristic to the resource constrained project scheduling problem (RCPSP). This computer heuristic, which is based on the COMSOAL heuristic, constructs a feasible solution at each iteration and chooses the best solution of several iterations. Although COMSOAL was originally a solution approach for the assembly-line balancing problem, it can be extended to provide solutions to the resource allocation problem. The Modified COMSOAL technique presented in this paper uses priority schemes intermittently with a random selection technique. This hybrid of randomness and priority scheme allows a good solution to be found quickly while not being forced into the same solution at each iteration. Several different priority schemes are examined within this research. The COMSOAL heuristic modified with the priority schemes heuristic was tested on several established test sets and the solution values are compared with both known optimal values and the results of several other resource allocation heuristics. In the vast majority of cases, the Modified COMSOAL heuristic outperformed the other heuristics in terms of both average and maximum percentage difference from optimal. The Modified COMSOAL heuristic seems to have several advantages over other RCPSP heuristics in that it is easy to understand, easy to implement, and achieves good results.
引用
收藏
页码:3275 / 3287
页数:13
相关论文
共 50 条
  • [1] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [2] A Novel Heuristic Algorithm for Spatial Resource Constrained Project Scheduling Problem
    Yu, Xiaoguang
    Zhan, Dechen
    Nie, Lanshun
    INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 1448 - 1453
  • [3] Heuristic Optimization for the Resource Constrained Project Scheduling Problem: a Systematic Mapping
    Ciupe, Aurelia
    Meza, Serban
    Orza, Bogdan
    PROCEEDINGS OF THE 2016 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2016, 8 : 619 - 626
  • [4] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [5] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [6] An Effective Memetic Algorithm for Resource Constrained Project Scheduling Problem
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2160 - 2166
  • [7] The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
    Ahn, T
    Erenguc, SS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 250 - 259
  • [8] A tree search heuristic for the resource constrained project scheduling problem with transfer times
    Liu, Ying
    Zhou, Jing
    Lim, Andrew
    Hu, Qian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 304 (03) : 939 - 951
  • [9] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [10] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)