A simple and effective heuristic for the resource constrained project scheduling problem

被引:15
|
作者
DePuy, GW [1 ]
Whitehouse, GE
机构
[1] Univ Louisville, Dept Ind Engn, Louisville, KY 40292 USA
[2] Univ Cent Florida, Orlando, FL 32816 USA
关键词
D O I
10.1080/00207540110060608
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the development and application of a simple heuristic to the resource constrained project scheduling problem (RCPSP). This computer heuristic, which is based on the COMSOAL heuristic, constructs a feasible solution at each iteration and chooses the best solution of several iterations. Although COMSOAL was originally a solution approach for the assembly-line balancing problem, it can be extended to provide solutions to the resource allocation problem. The Modified COMSOAL technique presented in this paper uses priority schemes intermittently with a random selection technique. This hybrid of randomness and priority scheme allows a good solution to be found quickly while not being forced into the same solution at each iteration. Several different priority schemes are examined within this research. The COMSOAL heuristic modified with the priority schemes heuristic was tested on several established test sets and the solution values are compared with both known optimal values and the results of several other resource allocation heuristics. In the vast majority of cases, the Modified COMSOAL heuristic outperformed the other heuristics in terms of both average and maximum percentage difference from optimal. The Modified COMSOAL heuristic seems to have several advantages over other RCPSP heuristics in that it is easy to understand, easy to implement, and achieves good results.
引用
收藏
页码:3275 / 3287
页数:13
相关论文
共 50 条
  • [31] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [32] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [33] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [34] A preemptive bound for the Resource Constrained Project Scheduling Problem
    Haouari, Mohamed
    Kooli, Anis
    Neron, Emmanuel
    Carlier, Jacques
    JOURNAL OF SCHEDULING, 2014, 17 (03) : 237 - 248
  • [35] A heuristic approach for resource constrained project scheduling with uncertain activity durations
    Bruni, M. E.
    Beraldi, P.
    Guerriero, F.
    Pinto, E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1305 - 1318
  • [36] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81
  • [37] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DAVIS, EW
    PATTERSON, JH
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955
  • [38] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    Annals of Operations Research, 2001, 102 : 65 - 81
  • [39] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [40] A heuristic method for resource constrained allocation in multi-project scheduling
    Ghomi, SMTF
    Ashjari, B
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 111 - 116