Heuristic for network project scheduling with random activity durations depending on the resource allocation

被引:0
|
作者
Ben-Gurion Univ of the Negev, Beer Sheva, Israel [1 ]
机构
来源
Int J Prod Econ | / 2卷 / 149-162期
关键词
Number:; -; Acronym:; Sponsor: Ben-Gurion University of the Negev;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Heuristic of Anticipation for Fair Scheduling and Resource Allocation in Grid VOs
    Toporkov, Victor
    Toporkova, Anna
    Yemelyanov, Dmitry
    INTELLIGENT DISTRIBUTED COMPUTING XI, 2018, 737 : 27 - 37
  • [32] A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    Lova, A
    Maroto, C
    Tormos, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (02) : 408 - 424
  • [33] Robustifying the resource-constrained project scheduling against uncertain durations
    Fu, Fang
    Liu, Qi
    Yu, Guodong
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [34] Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (04) : 2001 - 2020
  • [35] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi E.
    Aghaie A.
    Najafi A.A.
    Scientia Iranica, 2020, 27 (1 E) : 361 - 376
  • [36] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [37] Fuzzy Activity Network Method for Project Scheduling Under Resource Constraints
    Luong Duc Long
    Ohsato, Ario
    JOURNAL OF ADVANCED COMPUTATIONAL INTELLIGENCE AND INTELLIGENT INFORMATICS, 2007, 11 (08) : 914 - 921
  • [38] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Afruzi, E. Nabipoor
    Aghaie, A.
    Najafi, A. A.
    SCIENTIA IRANICA, 2020, 27 (01) : 361 - 376
  • [39] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [40] A BASIS FOR THE DESIGN OF A MULTIATTRIBUTE HEURISTIC FOR SINGLE RESOURCE PROJECT SCHEDULING
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (02) : 157 - 161