Heuristic for network project scheduling with random activity durations depending on the resource allocation

被引:0
|
作者
Ben-Gurion Univ of the Negev, Beer Sheva, Israel [1 ]
机构
来源
Int J Prod Econ | / 2卷 / 149-162期
关键词
Number:; -; Acronym:; Sponsor: Ben-Gurion University of the Negev;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Resource allocation for robust project scheduling
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2011, 59 (01) : 51 - 55
  • [22] Resource Allocation Heuristics for Project Scheduling
    Zhang, Yingxin
    Chen, Chao
    Shi, Jianmai
    SUSTAINABLE DEVELOPMENT AND ENVIRONMENT II, PTS 1 AND 2, 2013, 409-410 : 1539 - 1542
  • [23] Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations
    Zheng Zheng
    Lin Shumin
    Guo Ze
    Zhu Yueni
    International Journal of Computational Intelligence Systems, 2013, 6 : 530 - 547
  • [24] Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations
    Zheng Zheng
    Lin Shumin
    Guo Ze
    Zhu Yueni
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2013, 6 (03) : 530 - 547
  • [25] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):
  • [26] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
    Wang, Wei
    Shou, Yongyi
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
  • [27] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H.
    Zarandi, M. H. Fazel
    Alipouri, Y.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2013, 11 (3A) : 189 - 198
  • [28] An effective heuristic for project scheduling with resource availability cost
    Zhu, Xia
    Ruiz, Ruben
    Li, Shiyu
    Li, Xiaoping
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 257 (03) : 746 - 762
  • [29] A NEW HEURISTIC FOR PROJECT SCHEDULING WITH A SINGLE RESOURCE CONSTRAINT
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (03) : 381 - 387
  • [30] A NEW HEURISTIC FOR PROJECT SCHEDULING WITH A SINGLE RESOURCE CONSTRAINT
    KHATTAB, M
    CHOOBINEH, F
    COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) : 514 - 518