Multi-objective flow shop optimal scheduling considering worker's load

被引:0
|
作者
Sun, Bao-Feng [1 ]
Ren, Xin-Xin [1 ]
Zheng, Zai-Si [1 ,2 ]
Li, Guo-Yi [1 ]
机构
[1] College of Transportation, Jilin University, Changchun,130022, China
[2] Department of Product, FAW-Volkswagen Auntomobile Co., Ltd., Changchun,130011, China
关键词
Earliest due dates - Experimental analysis - Flow-shop scheduling - Nondominated solutions - Objective optimization - Optimal scheduling - Pareto optimal solutions - Shortest Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
To solve the problem of workers' load imbalance in the flow shop scheduling, a dual-objective optimization scheduling model is proposed in this paper with the minimum delay time and the workers' workload standard deviation. A NSGA-II based on two-gene chromosome coding is designed to obtain Pareto-optimal solutions. Two embedded heuristic rules, the earliest due date (EDD) rule and the shortest processing time (SPT) rule, are introduced together with NSGA-II to form the NSGA-II-EDD and NSGA-II-SPT for comparison. Computation experimental analysis shows that NSGA-II performs better in case of evaluation indexes with the average non-dominated solutions N, error ratio ER, spacing evaluation index S and Pareto front span K, but is worse in operation time T. © 2021, Jilin University Press. All right reserved.
引用
收藏
页码:900 / 909
相关论文
共 50 条
  • [21] A simulated annealing algorithm for multi-objective hybrid flow shop scheduling
    Ma, Shu-Mei
    Sun, Yun
    Li, Ai-Ping
    DESIGN, MANUFACTURING AND MECHATRONICS (ICDMM 2015), 2016, : 1463 - 1473
  • [22] Modelling and scheduling multi-objective flow shop problems with interfering jobs
    Torkashvand, M.
    Naderi, B.
    Hosseini, S. A.
    APPLIED SOFT COMPUTING, 2017, 54 : 221 - 228
  • [23] Study on No-Wait Flexible Flow Shop Scheduling with Multi-objective
    Tao, Ze
    Liu, Xiaoxia
    INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2019, PART VI, 2019, 11745 : 457 - 468
  • [24] A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem
    Shao, Zhongshi
    Pi, Dechang
    Shao, Weishi
    EXPERT SYSTEMS WITH APPLICATIONS, 2018, 113 : 77 - 99
  • [25] Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy
    Wu, Xiuli
    Shen, Xianli
    Cui, Qi
    SUSTAINABILITY, 2018, 10 (03):
  • [26] Multi-Objective Hybrid Flow-Shop Scheduling Problem Considering Energy Consumption and On-Time Delivery
    Zhou B.
    Liu W.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2019, 53 (07): : 773 - 779
  • [27] A multi-objective optimization algorithm for flow shop group scheduling problem with sequence dependent setup time and worker learning
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233
  • [28] Probabilistic multi-objective optimal power flow considering correlated wind power and load uncertainties
    Shargh, S.
    Ghazani, B. Khorshid
    Mohammadi-Ivatloo, B.
    Seyedi, H.
    Abapour, M.
    RENEWABLE ENERGY, 2016, 94 : 10 - 21
  • [29] A hybrid water flow algorithm for multi-objective flexible flow shop scheduling problems
    Trung Hieu Tran
    Ng, Kien Ming
    ENGINEERING OPTIMIZATION, 2013, 45 (04) : 483 - 502
  • [30] FUZZY MULTI-OBJECTIVE OPTIMAL POWER FLOW CONSIDERING UPFC
    Aghaei, Jamshid
    Ara, Afshin Lashkar
    Shabani, Meisam
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2012, 8 (02): : 1155 - 1166