Multi-objective flow shop optimal scheduling considering worker's load

被引:0
|
作者
Sun, Bao-Feng [1 ]
Ren, Xin-Xin [1 ]
Zheng, Zai-Si [1 ,2 ]
Li, Guo-Yi [1 ]
机构
[1] College of Transportation, Jilin University, Changchun,130022, China
[2] Department of Product, FAW-Volkswagen Auntomobile Co., Ltd., Changchun,130011, China
关键词
Earliest due dates - Experimental analysis - Flow-shop scheduling - Nondominated solutions - Objective optimization - Optimal scheduling - Pareto optimal solutions - Shortest Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
To solve the problem of workers' load imbalance in the flow shop scheduling, a dual-objective optimization scheduling model is proposed in this paper with the minimum delay time and the workers' workload standard deviation. A NSGA-II based on two-gene chromosome coding is designed to obtain Pareto-optimal solutions. Two embedded heuristic rules, the earliest due date (EDD) rule and the shortest processing time (SPT) rule, are introduced together with NSGA-II to form the NSGA-II-EDD and NSGA-II-SPT for comparison. Computation experimental analysis shows that NSGA-II performs better in case of evaluation indexes with the average non-dominated solutions N, error ratio ER, spacing evaluation index S and Pareto front span K, but is worse in operation time T. © 2021, Jilin University Press. All right reserved.
引用
收藏
页码:900 / 909
相关论文
共 50 条
  • [41] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Yi Sun
    Chaoyong Zhang
    Liang Gao
    Xiaojuan Wang
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 723 - 739
  • [42] A TSP-GA multi-objective algorithm for flow-shop scheduling
    Ponnambalam, SG
    Jagannathan, H
    Kataria, M
    Gadicherla, A
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 23 (11-12): : 909 - 915
  • [43] Multi-objective optimization for flow shop scheduling with the group technology assumption removed
    CIMS Center, Dalian University of Technology, Dalian 116024, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2009, 2 (348-355+361):
  • [44] A TSP-GA multi-objective algorithm for flow-shop scheduling
    Ponnambalam, S.G.
    Jagannathan, H.
    Kataria, M.
    Gadicherla, A.
    International Journal of Advanced Manufacturing Technology, 2004, 23 (11-12): : 909 - 915
  • [45] Optimal foraging algorithm based on cumulative prospect theory for multi-objective flow-shop scheduling problems
    Zhu G.
    Ding C.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (03): : 690 - 699
  • [46] An Improved Multi-objective Memetic Algorithm for Bi-objective Permutation Flow Shop Scheduling
    Zhao, Zhe-jian
    He, Xue-qing
    Liu, Feng
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [48] Multi-objective optimal scheduling for CCHP microgrids considering peak-load reduction by augmented ?-constraint method
    Yang, Xiaohui
    Leng, Zhengyang
    Xu, Shaoping
    Yang, Chunsheng
    Yang, Li
    Liu, Kang
    Song, Yaoren
    Zhang, Liufang
    RENEWABLE ENERGY, 2021, 172 : 408 - 423
  • [49] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [50] Study on Job Shop Scheduling Optimization with Multi-objective
    Ze, Tao
    Di, Liang
    Qun, Zhou
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 326 - +