Multi-objective flow shop optimal scheduling considering worker's load

被引:0
|
作者
Sun, Bao-Feng [1 ]
Ren, Xin-Xin [1 ]
Zheng, Zai-Si [1 ,2 ]
Li, Guo-Yi [1 ]
机构
[1] College of Transportation, Jilin University, Changchun,130022, China
[2] Department of Product, FAW-Volkswagen Auntomobile Co., Ltd., Changchun,130011, China
关键词
Earliest due dates - Experimental analysis - Flow-shop scheduling - Nondominated solutions - Objective optimization - Optimal scheduling - Pareto optimal solutions - Shortest Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
To solve the problem of workers' load imbalance in the flow shop scheduling, a dual-objective optimization scheduling model is proposed in this paper with the minimum delay time and the workers' workload standard deviation. A NSGA-II based on two-gene chromosome coding is designed to obtain Pareto-optimal solutions. Two embedded heuristic rules, the earliest due date (EDD) rule and the shortest processing time (SPT) rule, are introduced together with NSGA-II to form the NSGA-II-EDD and NSGA-II-SPT for comparison. Computation experimental analysis shows that NSGA-II performs better in case of evaluation indexes with the average non-dominated solutions N, error ratio ER, spacing evaluation index S and Pareto front span K, but is worse in operation time T. © 2021, Jilin University Press. All right reserved.
引用
收藏
页码:900 / 909
相关论文
共 50 条
  • [31] Multi-objective optimal power flow considering transient stability
    Ye, Chengjin
    Huang, Minxiang
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2013, 33 (10): : 137 - 144
  • [32] A hybrid escalating evolutionary algorithm for multi-objective flow-shop scheduling
    Shi, Ruifeng
    Zhou, Yiming
    Zhou, Hong
    ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 4, PROCEEDINGS, 2007, : 426 - +
  • [33] A TSP-GA multi-objective algorithm for flow-shop scheduling
    S. G. Ponnambalam
    H. Jagannathan
    M. Kataria
    A. Gadicherla
    The International Journal of Advanced Manufacturing Technology, 2004, 23 : 909 - 915
  • [34] Optimizing multi-objective scheduling problem of hybrid flow shop with limited buffer
    Yuan, Qing-Xin
    Dong, Shao-Hua
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2021, 43 (11): : 1491 - 1498
  • [35] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Sun, Yi
    Zhang, Chaoyong
    Gao, Liang
    Wang, Xiaojuan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8): : 723 - 739
  • [36] Multi-objective flexible flow shop batch scheduling problem with renewable energy
    Wu, Xiuli
    Xiao, Xiao
    Cui, Qi
    INTERNATIONAL JOURNAL OF AUTOMATION AND CONTROL, 2020, 14 (5-6) : 519 - 553
  • [37] Hybrid flow shop scheduling problem based on evolutionary multi-objective algorithm
    School of Computer Science and Technology, Harbin Institute of Technology, Harbin 150001, China
    Nanjing Li Gong Daxue Xuebao, 2006, 3 (327-331):
  • [38] Fast Multi-objective Hybrid Evolutionary Algorithm for Flow Shop Scheduling Problem
    Zhang, Wenqiang
    Lu, Jiaming
    Zhang, Hongmei
    Wang, Chunxiao
    Gen, Mitsuo
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 383 - 392
  • [39] A discrete group search optimizer for blocking flow shop multi-objective scheduling
    Deng Guanlong
    Zhang Shuning
    Zhao Mei
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (08) : 1 - 9
  • [40] A multi-objective ant colony system algorithm for flow shop scheduling problem
    Yagmahan, Betul
    Yenisey, Mehmet Mutlu
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) : 1361 - 1368