A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem

被引:24
|
作者
Shao, Zhongshi [1 ]
Pi, Dechang [1 ,2 ]
Shao, Weishi [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Comp Sci & Technol, Nanjing, Jiangsu, Peoples R China
[2] Collaborat Innovat Ctr Novel Software Technol & I, Nanjing, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Blocking flow-shop; Multi-objective optimization; Makespan; Total tardiness; Invasive weed optimization; TOTAL TARDINESS MINIMIZATION; TOTAL FLOWTIME MINIMIZATION; BEE COLONY ALGORITHM; HEURISTIC ALGORITHMS; MINIMIZING MAKESPAN; MEMETIC ALGORITHM; SEARCH ALGORITHM; PATH RELINKING; SCATTER SEARCH; LOCAL SEARCH;
D O I
10.1016/j.eswa.2018.06.020
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The flow-shop scheduling problem with blocking constraints has received an increasing concern recently. However, multiple scheduling criteria are rarely considered simultaneously in most research. Therefore, in this paper, a multi-objective blocking flow-shop scheduling problem (MOBFSP) that minimizes the makespan and total tardiness simultaneously is investigated. To address this problem, a multi-objective discrete invasive weed optimization (MODIWO) algorithm is proposed. In the proposed MODIWO, a high quality and diversified initial population is firstly constructed via two heuristics and varying weighed values. Then, a reference line-based reproduction and a sliding insertion-based spatial dispersal are developed to guide the global exploration and local exploitation of algorithm. Meanwhile, to enhance intensification search in local region, a self-adaption phase is introduced, which is implemented by a Pareto-based two stage local search with speedup mechanism. Furthermore, a new competitive exclusion strategy is also embedded to construct a superior population for the next generation. Finally, extensive computational experiments and comparisons with several recent state-of-the-art algorithms are carried out based on the well-known benchmark instances. Experimental results demonstrate the efficiency and effectiveness of the proposed MODIWO in solving the considered MOBFSP. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:77 / 99
页数:23
相关论文
共 50 条
  • [1] A novel multi-objective discrete water wave optimization for solving multi-objective blocking flow-shop scheduling problem
    Shao, Zhongshi
    Pi, Dechang
    Shao, Weishi
    KNOWLEDGE-BASED SYSTEMS, 2019, 165 : 110 - 131
  • [2] A MULTI-OBJECTIVE HYBRID DIFFERENTIAL OPTIMIZATION ALGORITHM FOR FLOW-SHOP SCHEDULING PROBLEM
    Pei, J. Y.
    Shan, P.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (03) : 500 - 509
  • [3] Solving a multi-objective overlapping flow-shop scheduling
    Huang, Rong-Hwa
    Yang, Chang-Lin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (9-10): : 955 - 962
  • [4] Solving a multi-objective overlapping flow-shop scheduling
    Rong-Hwa Huang
    Chang-Lin Yang
    The International Journal of Advanced Manufacturing Technology, 2009, 42 : 955 - 962
  • [5] Solving a multi-objective overlapping flow-shop scheduling
    Huang, Rong-Hwa
    Yang, Chang-Lin
    International Journal of Advanced Manufacturing Technology, 2009, 42 (9-10): : 955 - 962
  • [6] Multi-objective genetic algorithm for solving multi-objective flow-shop inverse scheduling problems
    Mou J.
    Guo Q.
    Gao L.
    Zhang W.
    Mou J.
    Mou, Jianhui (mjhcr@163.com), 1600, Chinese Mechanical Engineering Society (52): : 186 - 197
  • [7] Multi-objective flow-shop scheduling with parallel machines
    Murrieta Cortes, Beatriz
    Espinoza Garcia, Juan Carlos
    Regis Hernandez, Fabiola
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2796 - 2808
  • [8] Combinatorial optimization of stochastic multi-objective problems: An application to the flow-shop scheduling problem
    Liefooghe, Arnaud
    Basseur, Matthieu
    Jourdan, Laetitia
    Talbi, El-Ghazali
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PROCEEDINGS, 2007, 4403 : 457 - +
  • [9] Design of cooperative algorithms for multi-objective optimization: Application to the flow-shop scheduling problem
    Basseur M.
    4OR, 2006, 4 (3) : 81 - 84
  • [10] A discrete group search optimizer for blocking flow shop multi-objective scheduling
    Deng Guanlong
    Zhang Shuning
    Zhao Mei
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (08) : 1 - 9