Study on No-Wait Flexible Flow Shop Scheduling with Multi-objective

被引:1
|
作者
Tao, Ze [1 ]
Liu, Xiaoxia [2 ]
机构
[1] Shenyang Ligong Univ, Sch Mech Engn, Shenyang 110159, Peoples R China
[2] Henan Univ Technol, Zhengzhou 450001, Peoples R China
关键词
No-wait; Multi-objective; Flexible flow shop; Dual-resource; HYBRID; OPTIMIZATION; ALGORITHM;
D O I
10.1007/978-3-030-27529-7_39
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A multi-objective flexible flow shop scheduling model is constructed inclusive of production period, total expense, and mean flow time, which is based on the characteristics of dual-resource constrained no-wait flow shop scheduling problem with unrelated parallel machines. A genetic algorithm based on Pareto is proposed to solve the multi-objective scheduling problem. Then, consider the machine and worker constraints, and unrelated parallel machines and the successive processing, the production period is given through pushing reversely from the operation. The starting time of some jobs will be delayed and the spare time of machines will be increased in order to ensure the consecutive operations of the same job. Considering three objectives, an optimal set is given, and compared to other algorithms, simulation results show that the method is effective and feasible. At last, a comparative analysis of the same case is made from no-wait flow shop scheduling and flow shop scheduling with nonconsecutive operation.
引用
收藏
页码:457 / 468
页数:12
相关论文
共 50 条
  • [1] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    R. Tavakkoli-Moghaddam
    A. R. Rahimi-Vahed
    A. H. Mirzaei
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 36 : 969 - 981
  • [2] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    Tavakkoli-Moghaddam, R.
    Rahimi-Vahed, A. R.
    Mirzaei, A. H.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (9-10): : 969 - 981
  • [3] No-wait flow shop scheduling using fuzzy multi-objective linear programming
    Javadi, Babak
    Saidi-Mehrabad, M.
    Haji, Alireza
    Mahdavi, Iraj
    Jolai, F.
    Mahdavi-Amiri, N.
    [J]. JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2008, 345 (05): : 452 - 467
  • [4] Application of fuzzy multi-objective linear programming to no-wait flow shop scheduling
    Haji, Alireza
    Javadi, Babak
    Alipour, Kaveh Fallah
    [J]. RECENT PROGRESS IN COMPUTATIONAL SCIENCES AND ENGINEERING, VOLS 7A AND 7B, 2006, 7A-B : 192 - 194
  • [5] A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems
    Pan, Q-K
    Wang, L.
    Qian, B.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2008, 222 (04) : 519 - 539
  • [6] A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
    Rahimi-Vahed, A. R.
    Javadi, B.
    Rabbani, M.
    Tavakkoli-Moghaddam, R.
    [J]. ENGINEERING OPTIMIZATION, 2008, 40 (04) : 331 - 346
  • [7] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Qian, Bin
    Wang, Ling
    Huang, De-Xian
    Wang, Xiong
    [J]. SOFT COMPUTING, 2009, 13 (8-9) : 847 - 869
  • [8] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Bin Qian
    Ling Wang
    De-Xian Huang
    Xiong Wang
    [J]. Soft Computing, 2009, 13 : 847 - 869
  • [9] No-Wait Flexible Flow Shop Scheduling with Due Windows
    Huang, Rong-Hwa
    Yang, Chang-Lin
    Liu, Shang-Chia
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [10] Single Hoist Scheduling in No-Wait Flexible Flow Shop System
    Wang Shilong
    Yao Wei
    Zhou Jie
    [J]. ISIP: 2009 INTERNATIONAL SYMPOSIUM ON INFORMATION PROCESSING, PROCEEDINGS, 2009, : 381 - 386