No-wait flow shop scheduling using fuzzy multi-objective linear programming

被引:22
|
作者
Javadi, Babak [1 ]
Saidi-Mehrabad, M. [2 ]
Haji, Alireza [3 ]
Mahdavi, Iraj [1 ]
Jolai, F. [4 ]
Mahdavi-Amiri, N. [5 ]
机构
[1] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[4] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[5] Sharif Univ Technol, Dept Math Sci, Tehran, Iran
基金
美国国家科学基金会;
关键词
no-wait flow shop scheduling; multi-objective linear programming; fuzzy multi-objective linear programming; decision maker;
D O I
10.1016/j.jfranklin.2007.12.003
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:452 / 467
页数:16
相关论文
共 50 条
  • [1] Application of fuzzy multi-objective linear programming to no-wait flow shop scheduling
    Haji, Alireza
    Javadi, Babak
    Alipour, Kaveh Fallah
    [J]. RECENT PROGRESS IN COMPUTATIONAL SCIENCES AND ENGINEERING, VOLS 7A AND 7B, 2006, 7A-B : 192 - 194
  • [2] Study on No-Wait Flexible Flow Shop Scheduling with Multi-objective
    Tao, Ze
    Liu, Xiaoxia
    [J]. INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2019, PART VI, 2019, 11745 : 457 - 468
  • [3] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    R. Tavakkoli-Moghaddam
    A. R. Rahimi-Vahed
    A. H. Mirzaei
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 36 : 969 - 981
  • [4] Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
    Tavakkoli-Moghaddam, R.
    Rahimi-Vahed, A. R.
    Mirzaei, A. H.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (9-10): : 969 - 981
  • [5] A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems
    Pan, Q-K
    Wang, L.
    Qian, B.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2008, 222 (04) : 519 - 539
  • [6] A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
    Rahimi-Vahed, A. R.
    Javadi, B.
    Rabbani, M.
    Tavakkoli-Moghaddam, R.
    [J]. ENGINEERING OPTIMIZATION, 2008, 40 (04) : 331 - 346
  • [7] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Bin Qian
    Ling Wang
    De-Xian Huang
    Xiong Wang
    [J]. Soft Computing, 2009, 13 : 847 - 869
  • [8] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Qian, Bin
    Wang, Ling
    Huang, De-Xian
    Wang, Xiong
    [J]. SOFT COMPUTING, 2009, 13 (8-9) : 847 - 869
  • [9] Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search
    Wu, Xueqi
    Che, Ada
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 94
  • [10] Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search
    Wu, Xueqi
    Che, Ada
    [J]. Omega (United Kingdom), 2020, 94