Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization

被引:0
|
作者
Vedat Toğan
M. Azim Eirgash
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
来源
关键词
critical path method; multi-objective optimization; meta-heuristic algorithm; time-cost trade-off problem;
D O I
暂无
中图分类号
学科分类号
摘要
Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.
引用
收藏
页码:10 / 20
页数:10
相关论文
共 50 条
  • [31] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [32] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [33] Time-cost optimization using harmony search algorithm in construction projects
    Zalmai, Lemar Mohammad
    Akcay, Cemil
    Manisali, Ekrem
    REVISTA DE LA CONSTRUCCION, 2019, 18 (02): : 226 - 237
  • [34] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [35] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [36] Closure to "Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search" by Zong Woo Geem
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08): : 630 - 631
  • [37] Using machine learning and GA to solve time-cost trade-off problems
    Li, H
    Cao, JN
    Love, PED
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 347 - 353
  • [38] Discussion of "Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search" by Zong Woo Geem
    Moselhi, Osama
    Roofigari-Esfahan, Nazila
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08): : 629 - 630
  • [39] Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
    Xiong, Ying
    Kuang, Yaping
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (02) : 153 - 156
  • [40] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454