Using machine learning and GA to solve time-cost trade-off problems

被引:74
|
作者
Li, H [1 ]
Cao, JN [1 ]
Love, PED [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Build & Real Estate, Hung Hom, Kowloon, Peoples R China
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:5(347)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Existing genetic algorithms (GA) based systems for solving time-cost trade-off problems suffer from two limitations. First, these systems require the user to manually craft the time-cost curves for formulating the objective functions. Second, these systems only deal with linear time-cost relationships. To overcome these limitations, this paper presents a computer system called MLGAS (Machine Learning and Genetic Algorithms based System), which integrates a machine learning method with GA. A quadratic template is introduced to capture the nonlinearity of time-cost relationships. The machine learning method automatically generates the quadratic time-cost curves from historical data and also measures the credibility of each quadratic time-cost curve. The quadratic curves are then used to formulate the objective function that can be solved by the GA. Several improvements are made to enhance the capacity of GA to prevent premature convergence. Comparisons of MLGAS with an experienced project manager indicate that MLGAS generates better solutions to nonlinear time-cost trade-off problems.
引用
收藏
页码:347 / 353
页数:7
相关论文
共 50 条
  • [1] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    [J]. Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [2] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [3] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    [J]. J Comput Civ Eng, 3 (184-189):
  • [4] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [5] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [6] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [7] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [8] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    [J]. 2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +
  • [9] TIME-COST TRADE-OFF ANALYSIS IN SOME CONSTRAINED ASSIGNMENT PROBLEMS
    GEETHA, S
    VARTAK, MN
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (01) : 97 - 101
  • [10] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023,