共 50 条
- [23] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
- [29] Using genetic algorithms to solve construction time-cost trade-off problems J Comput Civ Eng, 3 (184-189):
- [30] Time-cost trade-off of construction project based on ant colony algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111