Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization

被引:0
|
作者
Vedat Toğan
M. Azim Eirgash
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
来源
关键词
critical path method; multi-objective optimization; meta-heuristic algorithm; time-cost trade-off problem;
D O I
暂无
中图分类号
学科分类号
摘要
Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.
引用
收藏
页码:10 / 20
页数:10
相关论文
共 50 条