Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows

被引:43
|
作者
Ammar, Mohammad A. [1 ]
机构
[1] Tanta Univ, Fac Engn, Dept Struct Engn, Tanta, Egypt
关键词
Project management; Time-cost trade-off; Discounted cash flows; Net present value; Optimization; Nonlinear programming; GENETIC ALGORITHMS; FLEXIBLE MODEL; NETWORKS;
D O I
10.1061/(ASCE)CO.1943-7862.0000256
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditional time-cost trade-off (TCTO) analysis assumes constant value of activities' cost along the project time span. However, the value of money decreases with time and, therefore, discounted cash flows should be considered when solving TCTO optimization problem. Optimization problems in project management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do not guarantee optimal solutions. A nonlinear mathematical optimization model for project TCTO problem is developed, which minimizes project direct cost and takes into account discounted cash flows. Costs of activities are assumed to be incurred at their finish times. The model guarantees the optimal solution, in which precise discrete activity time-cost function is used. The model input includes precedence relationship between project activities, discrete utility data for project activities, and discount rate. Details of model formulation are illustrated by an example project. The results show that selected activities' durations and costs and consequently optimal project duration differ from traditional analysis if discounted cash flow is considered. The new approach provides project practitioners with a way for considering net present value in time-cost decisions so that the best option can be identified.
引用
收藏
页码:65 / 71
页数:7
相关论文
共 50 条
  • [1] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [2] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [3] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [4] An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows
    Yazdani, Majid
    Aouam, Tarik
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2024, 163
  • [5] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    [J]. ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [6] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [7] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [8] SOLVING TIME COST TRADE-OFF PROBLEMS WITH DISCOUNTED CASH FLOWS USING GENERALIZED BENDERS DECOMPOSITION
    ERENGUC, SS
    TUFEKCI, S
    ZAPPE, CJ
    [J]. NAVAL RESEARCH LOGISTICS, 1993, 40 (01) : 25 - 50
  • [9] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [10] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    [J]. JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222