Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage

被引:0
|
作者
Deepak Gupta
Sonia Goel
Neeraj Mangla
机构
[1] Maharishi Markandeshwar (Deemed To Be University),
来源
International Journal of System Assurance Engineering and Management | 2022年 / 13卷
关键词
Flow shop scheduling; Equipotential machines; Optimization; Elapse time; Operational cost;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling jobs on equipotential machines is an activity that is very much a part of industrial scheduling. This research reports a methodology for minimizing the make span and operating cost of machineries in flow shop scheduling problem with m-equipotential machineries at first stage in addition single machine at second stage. In our research, we develop an algorithm for finding the optimal schedule for two stage flow shop scheduling problem using branch and bound technique. Modified distribution method is applied to find the optimum allocation of processing time of jobs to equipotential machines. The procedure helps the manager to reduce the time of manufacturing and overall production cost.
引用
收藏
页码:1162 / 1169
页数:7
相关论文
共 50 条
  • [21] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Dong Jian-ming
    Hu Jue-liang
    Chen Yong
    APPLIED MATHEMATICS-A JOURNAL OF CHINESE UNIVERSITIES SERIES B, 2013, 28 (03) : 358 - 368
  • [22] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    DONG Jianming
    HU Jueliang
    CHEN Yong
    AppliedMathematics:AJournalofChineseUniversities(SeriesB), 2013, 28 (03) : 358 - 368
  • [23] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Jian-ming Dong
    Jue-liang Hu
    Yong Chen
    Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368
  • [24] Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines
    Zahedi, Zahedi
    Salim, Ashadi
    Yusriski, Rinto
    Haris, Haris
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (02) : 225 - 238
  • [25] The two stage assembly flow-shop scheduling problem with batching and delivery
    Kazemi, Hamed
    Mazdeh, Mohammad Mahdavi
    Rostami, Mohammad
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 : 98 - 107
  • [26] A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
    Gerstl, Enrique
    Mosheiov, Gur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (01) : 161 - 166
  • [27] An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production
    Wang, Shijin
    Wang, Xiaodong
    Chu, Feng
    Yu, Jianbo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (08) : 2283 - 2314
  • [28] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470
  • [29] Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
    Seidgar, Hany
    Zandieh, Mostafa
    Mahdavi, Iraj
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 404 - 425
  • [30] A genetic algorithm for three-stage hybrid flow shop scheduling problem with dedicated machines
    Bedhief A.O.
    Dridi N.
    Journal Europeen des Systemes Automatises, 2020, 53 (03): : 357 - 368