共 50 条
- [44] Two-stage ACO to solve the job shop scheduling problem PROGRESS IN PATTERN RECOGNITION, IMAGE ANALYSIS AND APPLICATIONS, PROCEEDINGS, 2007, 4756 : 447 - 456
- [47] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3259 - 3274
- [48] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem Demirli, Kudret (kudret.demirli@concordia.ca), 1600, Springer London (95): : 9 - 12
- [49] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12): : 3259 - 3274