Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage

被引:0
|
作者
Deepak Gupta
Sonia Goel
Neeraj Mangla
机构
[1] Maharishi Markandeshwar (Deemed To Be University),
来源
International Journal of System Assurance Engineering and Management | 2022年 / 13卷
关键词
Flow shop scheduling; Equipotential machines; Optimization; Elapse time; Operational cost;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling jobs on equipotential machines is an activity that is very much a part of industrial scheduling. This research reports a methodology for minimizing the make span and operating cost of machineries in flow shop scheduling problem with m-equipotential machineries at first stage in addition single machine at second stage. In our research, we develop an algorithm for finding the optimal schedule for two stage flow shop scheduling problem using branch and bound technique. Modified distribution method is applied to find the optimum allocation of processing time of jobs to equipotential machines. The procedure helps the manager to reduce the time of manufacturing and overall production cost.
引用
收藏
页码:1162 / 1169
页数:7
相关论文
共 50 条
  • [31] Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint
    Li, Zhan-tao
    Chen, Qing-xin
    Mao, Ning
    Wang, Xiaoming
    Liu, Jianjun
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) : 667 - 678
  • [32] Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines
    Kaweegitbundit, Parinya
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 1487 - 1491
  • [33] Distributed two-stage hybrid flow shop scheduling
    Zhang Q.
    Sun Z.
    Lei D.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
  • [34] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Yi Tan
    Lars Mönch
    John W. Fowler
    Journal of Scheduling, 2018, 21 : 209 - 226
  • [35] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [36] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan
    Ren, Tao
    Liu, Bingqian
    Zhao, Peng
    Yuan, Huawei
    Li, Haiyan
    Bai, Danyu
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
  • [37] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Tan, Yi
    Moench, Lars
    Fowler, John W.
    JOURNAL OF SCHEDULING, 2018, 21 (02) : 209 - 226
  • [38] Optimal scheduling of a two-stage hybrid flow shop
    Haouari, Mohamed
    Hidri, Lotfi
    Gharbi, Anis
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 64 (01) : 107 - 124
  • [39] Optimal Scheduling of a Two-stage Hybrid Flow Shop
    Mohamed Haouari
    Lotfi Hidri
    Anis Gharbi
    Mathematical Methods of Operations Research, 2006, 64 : 107 - 124
  • [40] A two-stage hybrid flow shop with dedicated machines at the first stage
    Yang, Jaehwan
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (12) : 2836 - 2843