共 50 条
- [26] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times The International Journal of Advanced Manufacturing Technology, 2010, 46 : 695 - 705
- [27] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 695 - 705
- [29] Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times, Precedence Constraints, and Ready Times Using Variable Neighborhood Search CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 273 - 278
- [30] A tabu search algorithm for single machine scheduling with release times, due dates, and sequence-dependent set-up times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (11): : 859 - 866