共 50 条
- [31] A Tabu Search Algorithm for Single Machine Scheduling with Release Times, Due Dates, and Sequence-Dependent Set-up Times The International Journal of Advanced Manufacturing Technology, 2002, 19 : 859 - 866
- [36] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
- [38] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 777 - 794
- [39] Simulated annealing for parallel machine scheduling with split jobs and sequence-dependent set-ups INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2004, 11 (01): : 43 - 53