Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times

被引:25
|
作者
Ruiz, Ruben [1 ]
Andres-Romano, Carlos [2 ]
机构
[1] Univ Politecn Valencia, Grp Sistemas Optimizac Aplicada, Inst Tecnol Informat, Valencia 46021, Spain
[2] Univ Politecn Valencia, Dept Org Empresas, Valencia 46021, Spain
关键词
Scheduling; Unrelated parallel machines; Sequence-dependent setups; Total completion time; Resources; EARLINESS; JOBS;
D O I
10.1007/s00170-011-3318-2
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A novel scheduling problem that results from the addition of resource-assignable setups is presented in this paper. We consider an unrelated parallel machine problem with machine and job sequence-dependent setup times. The new characteristic is that the amount of setup time does not only depend on the machine and job sequence but also on the amount of resources assigned, which can vary between a minimum and a maximum. The aim is to give solution to real problems arising in several industries where frequent setup operations in production lines have to be carried out. These operations are indeed setups whose length can be reduced or extended according to the amount of resources assigned to them. The objective function considered is a linear combination of total completion time and the total amount of resources assigned. We present a mixed integer program (MIP) model and some fast dispatching heuristics. We carry out careful and comprehensive statistical analyses to study what characteristics of the problem affect the MIP model performance. We also study the effectiveness of the different heuristics proposed.
引用
收藏
页码:777 / 794
页数:18
相关论文
共 50 条
  • [1] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Rubén Ruiz
    Carlos Andrés-Romano
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
  • [2] Metaheuristic for Parallel Machines Scheduling with Resource-assignable Sequence Dependent Setup Times
    Costa Bicalho, Luis Henrique
    dos Santos, Andre Gustavo
    Claudio Arroyo, Jose Elias
    [J]. GECCO-2011: PROCEEDINGS OF THE 13TH ANNUAL GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2011, : 449 - 455
  • [3] Scheduling unrelated parallel machines with sequence-dependent setup times
    Zeidi, Javad Rezaeian
    MohammadHosseini, Samir
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
  • [4] Scheduling unrelated parallel machines with sequence-dependent setup times
    Javad Rezaeian Zeidi
    Samir MohammadHosseini
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
  • [5] Reactive GRASP with path relinking for solving parallel machines scheduling problem with resource-assignable sequence dependent setup times
    Kampke, Edmar Hell
    Claudio Arroyo, Jose Elias
    dos Santos, Andre Gustavo
    [J]. 2009 WORLD CONGRESS ON NATURE & BIOLOGICALLY INSPIRED COMPUTING (NABIC 2009), 2009, : 923 - 928
  • [6] Iterated Local Search with Path Relinking for Solving Parallel Machines Scheduling Problem with Resource-Assignable Sequence Dependent Setup Times
    Kampke, Edmar Hell
    Claudio Arroyo, Jose Elias
    Santos, Andre Gustavo
    [J]. EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2010, 6022 : 107 - 118
  • [7] Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints
    Hu, Dayong
    Yao, Zhenqiang
    [J]. ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2528 - 2531
  • [8] Scheduling jobs on parallel machines with sequence-dependent setup times
    Lee, YH
    Pinedo, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 464 - 474
  • [9] Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times
    Ezugwu, Absalom E.
    Adeleke, Olawale J.
    Viriri, Serestina
    [J]. PLOS ONE, 2018, 13 (07):
  • [10] An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
    Ezugwu, Absalom E.
    Akutsah, Francis
    [J]. IEEE ACCESS, 2018, 6 : 54459 - 54478