Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times

被引:3
|
作者
Giovanni Celano
Antonio Costa
Sergio Fichera
机构
[1] Università di Catania,Dipartimento di Ingegneria Industriale e Meccanica
关键词
Semiconductor wafer inspection; Group scheduling; Flowshop with buffers; Sequence-dependent set-up times;
D O I
暂无
中图分类号
学科分类号
摘要
The scheduling of families of semiconductor wafers within the inspection department of a company producing electronic devices is considered in this paper. Changing the family of wafers to be inspected by an inspection machine requires a sequence-dependent set-up time; furthermore, due to the limited space availability of the inspection area, the available interoperational buffer capacity between the inspection machines is finite. The objective of the scheduling is the maximization of inspection department productivity, measured through the sequence makespan. A permutational flowshop group-scheduling problem (GSP) with sequence-dependent set-up times and limited interoperational buffer capacity has been taken into account. A benchmark of process scenarios considering different numbers of inspection machines wafers codes and families to be inspected has been generated. A Genetic Algorithm is here proposed as an efficient tool to solve the investigated problem. A comparison with a tabu search and a Nawaz, Enscore, and Ham procedure improving the currently available scheduler tool within the inspection department has been performed on the benchmark of problems. Finally, the influence on line productivity due to the finite interoperational buffer capacity is investigated.
引用
收藏
页码:695 / 705
页数:10
相关论文
共 50 条
  • [1] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times
    Celano, Giovanni
    Costa, Antonio
    Fichera, Sergio
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 695 - 705
  • [2] Heuristic scheduling of parallel machines with sequence-dependent set-up times
    Kurz, ME
    Askin, RG
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (16) : 3747 - 3769
  • [3] Scheduling jobs on parallel machines with sequence-dependent family set-up times
    Eom, DH
    Shin, HJ
    Kwun, IH
    Shim, JK
    Kim, SS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (12): : 926 - 932
  • [4] Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times
    D.-H. Eom
    H.-J. Shin
    I.-H. Kwun
    J.-K. Shim
    S.-S. Kim
    The International Journal of Advanced Manufacturing Technology, 2002, 19 : 926 - 932
  • [5] Group-shop scheduling with sequence-dependent set-up and transportation times
    Ahmadizar, Fardin
    Shahmaleki, Parmis
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (21-22) : 5080 - 5091
  • [6] A SAVINGS INDEX HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING WITH SEQUENCE-DEPENDENT SET-UP TIMES
    DAS, SR
    GUPTA, JND
    KHUMAWALA, BM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (11) : 1365 - 1373
  • [7] A production scheduling problem with uncertain sequence-dependent set-up times and random yield
    Joo, Byung Jun
    Xirouchakis, Paul
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2820 - 2835
  • [8] Scheduling with shutdowns and sequence dependent set-up times
    Department of Industrial Engineering, College of Engineering, Osaka Prefecture University, Gakuencho, Sakai, Osaka, 599-8531, Japan
    Int J Prod Res, 7 (1661-1676):
  • [9] Scheduling with shutdowns and sequence dependent set-up times
    Asano, M
    Ohta, H
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (07) : 1661 - 1676
  • [10] Minimising makespan in flowshop group scheduling with sequence-dependent family set-up times using inserted idle times
    Neufeld, J. S.
    Gupta, J. N. D.
    Buscher, U.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1791 - 1806