Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times

被引:0
|
作者
D.-H. Eom
H.-J. Shin
I.-H. Kwun
J.-K. Shim
S.-S. Kim
机构
[1] Department of Industrial Engineering,
[2] Korea University 5-1,undefined
[3] Sungbuk-ku,undefined
[4] Seoul,undefined
[5] Korea,undefined
[6] Department of Mechanical Engineering,undefined
[7] Korea University 5-1,undefined
[8] Sungbuk-ku,undefined
[9] Seoul,undefined
[10] Korea,undefined
关键词
Key words: Heuristics; Parallel machines; Scheduling; Sequence-dependent family set-up times; Total weighted tardiness;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:926 / 932
页数:6
相关论文
共 50 条
  • [1] Scheduling jobs on parallel machines with sequence-dependent family set-up times
    Eom, DH
    Shin, HJ
    Kwun, IH
    Shim, JK
    Kim, SS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (12): : 926 - 932
  • [2] Heuristic scheduling of parallel machines with sequence-dependent set-up times
    Kurz, ME
    Askin, RG
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (16) : 3747 - 3769
  • [3] Scheduling jobs on parallel machines with sequence-dependent setup times
    Lee, YH
    Pinedo, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 464 - 474
  • [4] Robust scheduling of parallel. machines with sequence-dependent set-up costs
    Anglani, A
    Grieco, A
    Guerriero, E
    Musmanno, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (03) : 704 - 720
  • [5] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
  • [6] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Lee, Zne-Jung
    Lin, Shih-Wei
    Ying, Kuo-Ching
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
  • [7] Scheduling algorithms for parallel machines with sequence-dependent set-up and distinct ready times: minimizing total tardiness
    Kim, Sang-Il
    Choi, Hyun-Seon
    Lee, Dong-Ho
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2007, 221 (06) : 1087 - 1096
  • [8] Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times
    Strohhecker, Juergen
    Hamann, Michael
    Thun, Joern-Henrik
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) : 6747 - 6767
  • [9] Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
    Reddy, V
    Narendran, TT
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (01) : 193 - 206
  • [10] Group-shop scheduling with sequence-dependent set-up and transportation times
    Ahmadizar, Fardin
    Shahmaleki, Parmis
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (21-22) : 5080 - 5091