Scheduling with shutdowns and sequence dependent set-up times

被引:14
|
作者
Asano, M [1 ]
Ohta, H [1 ]
机构
[1] Univ Osaka Prefecture, Coll Engn, Dept Ind Engn, Sakai, Osaka 5998531, Japan
关键词
D O I
10.1080/002075499191184
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a single machine scheduling problem with ready and due times constraints on jobs, shutdown constraints on the machine and sequence dependent set-up times among jobs. The shutdown is a disruptive event such as holiday, breaks or machine maintenance, and has a prespecified period when the machine will be interrupted. If no pre-emption is allowed for jobs, shutdown constraints divide the planning horizon into disconnected time windows. An optimization algorithm based on the branch-and-bound method is developed to minimize the maximum tardiness for solving the problem. This paper further develops the post-processing algorithm that manipulates the starting time of the shutdown period so as to reduce the obtained maximum tardiness. The post-processing algorithm can determine plural schedules to reduce the maximum tardiness, and the production manager will select the objective schedule among them for the interest of overall efficiency. Computational results for the proposed algorithms will indicate that the post-processing algorithm can improve upon the original solution and the problems with multiple shutdowns and with set-up times varying widely can be satisfactorily solved.
引用
收藏
页码:1661 / 1676
页数:16
相关论文
共 50 条
  • [1] Scheduling with shutdowns and sequence dependent set-up times
    Department of Industrial Engineering, College of Engineering, Osaka Prefecture University, Gakuencho, Sakai, Osaka, 599-8531, Japan
    Int J Prod Res, 7 (1661-1676):
  • [2] A WARNING ABOUT CYCLIC LOT SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIMES
    CARTER, MW
    MAGAZINE, MJ
    MOON, TS
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (07) : 1281 - 1283
  • [3] Heuristic scheduling of parallel machines with sequence-dependent set-up times
    Kurz, ME
    Askin, RG
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (16) : 3747 - 3769
  • [4] Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times
    D.-H. Eom
    H.-J. Shin
    I.-H. Kwun
    J.-K. Shim
    S.-S. Kim
    The International Journal of Advanced Manufacturing Technology, 2002, 19 : 926 - 932
  • [5] SEQUENCE DEPENDENT SET-UP TIMES AND JOB SEQUENCING
    WHITE, CH
    WILSON, RC
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (02) : 191 - 202
  • [6] Group-shop scheduling with sequence-dependent set-up and transportation times
    Ahmadizar, Fardin
    Shahmaleki, Parmis
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (21-22) : 5080 - 5091
  • [7] Scheduling jobs on parallel machines with sequence-dependent family set-up times
    Eom, DH
    Shin, HJ
    Kwun, IH
    Shim, JK
    Kim, SS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (12): : 926 - 932
  • [8] WARNING ABOUT CYCLIC LOT SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIMES.
    Carter, Michael W.
    Magazine, Michael J.
    Moon, Tae-Shik
    International Journal of Production Research, 1988, 26 (07): : 1281 - 1283
  • [9] A production scheduling problem with uncertain sequence-dependent set-up times and random yield
    Joo, Byung Jun
    Xirouchakis, Paul
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2820 - 2835
  • [10] A SAVINGS INDEX HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING WITH SEQUENCE-DEPENDENT SET-UP TIMES
    DAS, SR
    GUPTA, JND
    KHUMAWALA, BM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (11) : 1365 - 1373