共 50 条
- [41] The Highway Construction Cost Control Model Based On The Improved Earned Value Method Theory 2016 INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2016, : 461 - 464
- [43] Use of Earned Value Management in the UAE Construction Industry 2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
- [44] Earned Value Management for China AP1000/CAP1400 Nuclear Power Plant Construction Projects PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 881 - 890
- [45] Application of Earned Value Method for evaluation the Time/Cost Consequences of Variation Orders in a Construction Project WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2017, 245
- [47] Monitoring software projects with earned value analysis and use case point 7TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE IN CONJUNCTION WITH 2ND IEEE/ACIS INTERNATIONAL WORKSHOP ON E-ACTIVITY, PROCEEDINGS, 2008, : 475 - 480
- [49] PERFORMANCE BASED EARNED VALUE: METHOD AND USE IDIMT-2009: SYSTEM AND HUMANS, A COMPLEX RELATIONSHIP, 2009, 29 : 39 - 45