Reducing work in process (WIP) with fuzzy logic at job shop scheduling

被引:0
|
作者
Canbolat, YB [1 ]
Ariduru, A [1 ]
Gundogar, E [1 ]
Aksoy, MS [1 ]
机构
[1] Qafqaz Univ, Dept Ind Engn, Baku, Azerbaijan
关键词
scheduling; dynamic; AI-supported simulation; decision support system; AI in simulation;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job shop is the most widely used production organization. The job shop production control system should schedule the incoming orders according to the capacity constraint of individual workstations or processes. One of the problems encountered at the job shop scheduling is minimum production size of machine, which is different from each other. Whereas 100 units order can be opened to some machine, 1000 units order can be opened another. This case increases WIP. In this study, a new approach was improved to reduce WIP. In this new approach, the parts, which materials are in stock and ordered very frequently are assigned to machine to reduce WIP. The new approach improved in this study is not applied at traditional job shop effectively. In this study, fuzzy logic is used to cope with this problem. Fuzzy logic determines which order assigned to the slack machine reviewing the minimum order size, materials size, load size of next machine, and order frequency. New approach was simulated at the job shop that has 15 machine and 50 orders. Simulation results show that new approach reduces WIP.
引用
收藏
页码:271 / 275
页数:5
相关论文
共 50 条
  • [21] Job shop scheduling by taboo search with fuzzy reasoning
    Wan, GH
    Wan, F
    [J]. 2003 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-5, CONFERENCE PROCEEDINGS, 2003, : 1566 - 1570
  • [22] Job Shop Scheduling Problem with Fuzzy Random Variables
    Nie, Ling
    Ni, Ting
    [J]. 2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 626 - 630
  • [23] A JOB SHOP SCHEDULING SYSTEM BASED ON FUZZY ARITHMETIC
    KERR, RM
    WALKER, RN
    [J]. EXPERT SYSTEMS AND THE LEADING EDGE IN PRODUCTION AND OPERATIONS MANAGEMENT: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE, 1989, : 433 - 450
  • [24] Job Shop Scheduling Problem with Late Work Criterion
    Piroozfard, Hamed
    Wong, Kuan Yew
    [J]. INTERNATIONAL CONFERENCE ON MATHEMATICS, ENGINEERING AND INDUSTRIAL APPLICATIONS 2014 (ICOMEIA 2014), 2015, 1660
  • [25] Lot scheduling with multiple process routes in job shop
    Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China
    [J]. Zhongguo Jixie Gongcheng, 2008, 2 (183-187):
  • [26] Research on process planning for the job shop scheduling integration
    Liu, Xiangde
    Zhang, Yi
    Li, Yan
    [J]. RESEARCH IN MECHANICAL ENGINEERING AND MATERIAL SCIENCE, 2014, 456 : 620 - 623
  • [27] On optimization of batch process of job-shop scheduling
    Sun, Zhi-Jun
    Qiao, Bing
    Pan, Quan-Ke
    Zhu, Jian-Ying
    [J]. Jixie Kexue Yu Jishu/Mechanical Science and Technology, 2002, 21 (03):
  • [28] Integration of process planning and scheduling in a job shop environment
    Manish Kumar
    Sunil Rajotia
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 28 : 109 - 116
  • [29] Integration of process planning and scheduling in a job shop environment
    Kumar, M
    Rajotia, S
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (1-2): : 109 - 116
  • [30] Mathematical models and benchmarking for the fuzzy job shop scheduling problem
    Afsar, Sezin
    Vela, Camino R.
    Palacios, Juan Jose
    Gonzalez-Rodriguez, Ines
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 183