Mathematical models and benchmarking for the fuzzy job shop scheduling problem

被引:6
|
作者
Afsar, Sezin [1 ]
Vela, Camino R. [1 ]
Palacios, Juan Jose [1 ]
Gonzalez-Rodriguez, Ines [2 ]
机构
[1] Univ Oviedo, Dept Comp, Campus Gijon, Gijon 33204, Spain
[2] Univ Cantabria, Dept Matemat Estadist & Comp, Av Castros S-N, Santander 39005, Spain
关键词
Scheduling; Job shop; Fuzzy numbers; Mathematical models; Benchmark; Metaheuristics; SWARM OPTIMIZATION; PROCESSING TIME; UNCERTAINTY; ALGORITHM; INSTANCES;
D O I
10.1016/j.cie.2023.109454
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The fuzzy job shop scheduling problem with makespan minimisation has received considerable attention over the last decade. Different sets of benchmark instances have been made available, and many metaheuristic solutions and corresponding upper bounds of the optimal makespan have been given for these instances in different publications. However, unlike the deterministic case, very little work has been invested in proposing and solving mathematical models for the fuzzy problem. This has resulted both in a lack of a good characterisation of the hardness of existing benchmark instances and in the absence of reliable lower and upper bounds for the makespan. In consequence, it is difficult, if not impossible to properly assess and compare new proposals of exact or approximate solving methods, thus hindering progress in this field. In this work we intend to fill this gap by proposing and solving two mathematical models, a mixed integer linear programming model and a constraint programming model. A thorough analysis on the scalability of solving these mathematical models with commercial solvers is carried out. A state-of-the-art metaheuristic algorithm from the literature is also used as reference point for a better understanding of the results. Using solvers of different nature allows us to improve known upper and lower bounds for all existing instances, and certify optimality for many of them for the first time. It also enables us to structurally characterise the instances' hardness beyond their size.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Mathematical Models of Flow Shop and Job Shop Scheduling Problems
    Seda, Milos
    PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 25, 2007, 25 : 122 - 127
  • [2] Robust job shop scheduling problem: Mathematical models, exact and heuristic algorithms
    Jamili, Amin
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 55 : 341 - 350
  • [3] Mathematical Models for a Flexible Job Shop Scheduling Problem with Machine Operator Constraints
    Kress, Dominik
    Mueller, David
    IFAC PAPERSONLINE, 2019, 52 (13): : 94 - 99
  • [4] A Novel Instance Generator for Benchmarking the Job Shop Scheduling Problem
    March, Carlos
    Perez, Christian
    Salido, Miguel A.
    ADVANCES AND TRENDS IN ARTIFICIAL INTELLIGENCE: THEORY AND APPLICATIONS, IEA-AIE 2024, 2024, 14748 : 413 - 424
  • [5] Fuzzy job shop scheduling problem with availability constraints
    Lei, Deming
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (04) : 610 - 617
  • [6] Job Shop Scheduling Problem with Fuzzy Random Variables
    Nie, Ling
    Ni, Ting
    2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 626 - 630
  • [7] A survey of job shop scheduling problem: The types and models
    Xiong, Hegen
    Shi, Shuangyuan
    Ren, Danni
    Hu, Jinjin
    COMPUTERS & OPERATIONS RESEARCH, 2022, 142
  • [8] Fuzzy job shop scheduling
    Kuroda, M
    Wang, Z
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) : 45 - 51
  • [9] Fuzzy job shop scheduling
    Aoyama Gakuin Univ, Tokyo, Japan
    Int J Prod Econ, 1-2 (45-51):
  • [10] ALGEBRAIC, MATHEMATICAL-PROGRAMMING, AND NETWORK MODELS OF THE DETERMINISTIC JOB-SHOP SCHEDULING PROBLEM
    ROGERS, RV
    WHITE, KP
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1991, 21 (03): : 693 - 697