Lot scheduling with multiple process routes in job shop

被引:0
|
作者
Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China [1 ]
机构
来源
Zhongguo Jixie Gongcheng | 2008年 / 2卷 / 183-187期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Lot streaming in job-shop scheduling
    DauzerePeres, S
    Lasserre, JB
    OPERATIONS RESEARCH, 1997, 45 (04) : 584 - 595
  • [2] Fuzzy job shop scheduling with lot-sizing
    Sanja Petrovic
    Carole Fayad
    Dobrila Petrovic
    Edmund Burke
    Graham Kendall
    Annals of Operations Research, 2008, 159 : 275 - 292
  • [3] Benefits of lot splitting in job-shop scheduling
    Chinyao Low
    Chih-Ming Hsu
    Kai-I Huang
    The International Journal of Advanced Manufacturing Technology, 2004, 24 : 773 - 780
  • [4] Fuzzy job shop scheduling with lot-sizing
    Petrovic, Sanja
    Fayad, Carole
    Petrovic, Dobrila
    Burke, Edmund
    Kendall, Graham
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 275 - 292
  • [5] Benefits of lot splitting in job-shop scheduling
    Low, C
    Hsu, CM
    Huang, KI
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (9-10): : 773 - 780
  • [6] Lot sizing and job shop scheduling with compressible process times: A cut and branch approach
    Karimi-Nasab, M.
    Modarres, M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 85 : 196 - 205
  • [7] Animation of a job shop scheduling process
    Shaw, WH
    Li, YE
    PIONEERING NEW TECHNOLOGIES: MANAGEMENT ISSUES AND CHALLENGES IN THE THIRD MILLENNIUM, PROCEEDINGS, 1998, : 28 - 33
  • [8] AN ITERATIVE PROCEDURE FOR LOT STREAMING IN JOB-SHOP SCHEDULING
    DAUZEREPERES, S
    LASSERRE, JB
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 231 - 234
  • [9] Lot splitting and optimization strategy for Job-Shop scheduling
    School of Mechanical Engineering, Jiangnan University, Wuxi 214122, China
    Jixie Gongcheng Xuebao, 21 (165-171): : 165 - 171
  • [10] A mathematical model for job shop scheduling with multiple process plan consideration per job
    Kim, KH
    Egbelu, PJ
    PRODUCTION PLANNING & CONTROL, 1998, 9 (03) : 250 - 259