Reducing work in process (WIP) with fuzzy logic at job shop scheduling

被引:0
|
作者
Canbolat, YB [1 ]
Ariduru, A [1 ]
Gundogar, E [1 ]
Aksoy, MS [1 ]
机构
[1] Qafqaz Univ, Dept Ind Engn, Baku, Azerbaijan
关键词
scheduling; dynamic; AI-supported simulation; decision support system; AI in simulation;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job shop is the most widely used production organization. The job shop production control system should schedule the incoming orders according to the capacity constraint of individual workstations or processes. One of the problems encountered at the job shop scheduling is minimum production size of machine, which is different from each other. Whereas 100 units order can be opened to some machine, 1000 units order can be opened another. This case increases WIP. In this study, a new approach was improved to reduce WIP. In this new approach, the parts, which materials are in stock and ordered very frequently are assigned to machine to reduce WIP. The new approach improved in this study is not applied at traditional job shop effectively. In this study, fuzzy logic is used to cope with this problem. Fuzzy logic determines which order assigned to the slack machine reviewing the minimum order size, materials size, load size of next machine, and order frequency. New approach was simulated at the job shop that has 15 machine and 50 orders. Simulation results show that new approach reduces WIP.
引用
收藏
页码:271 / 275
页数:5
相关论文
共 50 条
  • [31] Research on multi-objective fuzzy job shop scheduling
    Lei, De-Ming
    Wu, Zhi-Ming
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (02): : 174 - 179
  • [32] Study on the job shop dynamic scheduling under fuzzy environments
    Li Fu-ming
    Zhu Yun-long
    [J]. 2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 90 - 96
  • [33] Job shop scheduling with dynamic fuzzy selection of dispatching rules
    Subramaniam, V
    Ramesh, T
    Lee, GK
    Wong, YS
    Hong, GS
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2000, 16 (10): : 759 - 764
  • [34] Job Shop Scheduling with Dynamic Fuzzy Selection of Dispatching Rules
    V. Subramaniam
    T. Ramesh
    G. K. Lee
    Y. S. Wong
    G. S. Hong
    [J]. The International Journal of Advanced Manufacturing Technology, 2000, 16 : 759 - 764
  • [35] Hybrid ant colony algorithm for fuzzy Job Shop scheduling
    Shenyang Inst. of Automation, Chinese Academy of Sciences, Shenyang 110016, China
    不详
    [J]. Jisuanji Jicheng Zhizao Xitong, 2007, 1 (105-109+125):
  • [36] Artificial bee colony algorithm for fuzzy job shop scheduling
    Zheng, You-Lian
    Li, Yuan-Xiang
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 44 (02) : 124 - 129
  • [37] Job-shop scheduling problem with fuzzy processing times
    Lin, FT
    [J]. COMPUTATIONAL SCIENCE -- ICCS 2001, PROCEEDINGS PT 2, 2001, 2074 : 409 - 418
  • [38] Flexible job-shop fuzzy scheduling based on fuzzy delivery deadline
    Zhao, Lili
    Chen, Chao
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (01): : 51 - 56
  • [39] Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems
    Yun, YS
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (03) : 623 - 644
  • [40] Study on the job shop fuzzy dynamic scheduling based on virtual pre-scheduling
    Li, Fuming
    Zhu, Yunlong
    Yin, Chaowan
    Song, Xiaoyu
    [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7348 - 7352