Fuzzy activity times in critical path and project crashing problems

被引:0
|
作者
Liu, ST [1 ]
机构
[1] Van Nung Inst Technol, Grad Sch Business & Management, Tao Yuan 320, Taiwan
关键词
D O I
10.1080/01969720302865
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Program Evaluation and Review Technique (PERT) is extensively used in research and development projects. Closely associated with PERT is the problem of resource utilization to reduce project duration time. This article develops solution procedures for the critical path and the project crashing problems with fuzzy activity times in project planning. The idea is based on Yager's method to change the fuzzy formulation of the problem to a crisp problem. Due to the special structure of the project network, the conventional streamlined methods can be applied to find an optimal solution. The derived fuzzy completion time of the project indicates not only the most likely value, but also the range in which the completion time will appear. With the method proposed in this article, more information is provided for the project manager to make decisions.
引用
收藏
页码:161 / 172
页数:12
相关论文
共 50 条
  • [1] Critical path analysis with fuzzy activity times
    Liberatore, Matthew J.
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2008, 55 (02) : 329 - 337
  • [2] Critical path analysis in the network with fuzzy activity times
    Chanas, S
    Zielinski, P
    [J]. FUZZY SETS AND SYSTEMS, 2001, 122 (02) : 195 - 204
  • [4] Critical path method in activity networks with fuzzy activities duration times
    Lin, FT
    [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 1155 - 1160
  • [5] Fuzzy Optimal Solution of Fully Fuzzy Project Crashing Problems with New Representation of LR Flat Fuzzy Numbers
    Kumar, Amit
    Kaur, Parmpreet
    Kaur, Jagdeep
    [J]. ROUGH SETS, FUZZY SETS, DATA MINING AND GRANULAR COMPUTING, RSFDGRC 2011, 2011, 6743 : 171 - 174
  • [6] PROJECT NETWORK ANALYSIS WITH FUZZY ACTIVITY TIMES
    MCCAHON, CS
    LEE, ES
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 1988, 15 (10) : 829 - 838
  • [7] Application of fuzzy linear programming to project crashing decisions with fuzzy variables
    Liang, Tien-Fu
    Cheng, Hung-Wen
    Chen, Ping-Yen
    Shen, Kuan-Hsinung
    [J]. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2008, 11 (03): : 499 - 516
  • [8] Exact Optimal Solution of Fuzzy Critical Path Problems
    Kumar, Amit
    Kaur, Parmpreet
    [J]. APPLICATIONS AND APPLIED MATHEMATICS-AN INTERNATIONAL JOURNAL, 2011, 6 (01): : 251 - 267
  • [9] Project scheduling problem with fuzzy activity duration times
    Ke, H
    Liu, BD
    [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
  • [10] A simple approach to fuzzy critical path analysis in project networks
    Chen, Shih-Pin
    Hsueh, Yi-Ju
    [J]. APPLIED MATHEMATICAL MODELLING, 2008, 32 (07) : 1289 - 1297