- [6] Project scheduling problem with fuzzy activity duration times [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
- [9] Critical path method in activity networks with fuzzy activities duration times [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 1155 - 1160
- [10] Project network planning on the basis of generalized fuzzy critical path method [J]. STATE OF THE ART IN COMPUTATIONAL INTELLIGENCE, 2000, : 133 - 139