Analysis of critical paths in a project network with fuzzy activity times

被引:71
|
作者
Chen, Shih-Pin [1 ]
机构
[1] Natl Chung Cheng Univ, Dept Business Adm, Chiayi 621, Taiwan
关键词
critical path method (CPM); fuzzy sets; project management;
D O I
10.1016/j.ejor.2006.06.053
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper proposes an approach to critical path analysis for a project network with activity times being fuzzy numbers, in that the membership function of the fuzzy total duration time is constructed. The basic idea is based on the extension principle and linear programming formulation. A pair of linear programs parameterized by possibility level a is formulated to calculate the lower and upper bounds of the fuzzy total duration time at alpha. By enumerating different values of a, the membership function of the fuzzy total duration time is constructed, and the fuzzy critical paths are identified at the same time. Moreover, by applying the Yager ranking method, definitions of the most critical path and the relative degree of criticality of paths are developed; and these definitions are theoretically sound and easy to use in practice. Two examples with activity times being fuzzy numbers of L-R and L-L types discussed in previous studies are solved successfully to demonstrate the validity of the proposed approach. Since the total duration time is completely expressed by a membership function rather than by a crisp value, the fuzziness of activity times is conserved completely, and more information is provided for critical path analysis. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:442 / 459
页数:18
相关论文
共 50 条
  • [21] Fuzzy Network Data Envelopment Analysis in the Evaluation of Project Success Across the Project Life Cycle
    Kuchta, Dorota
    Klaus-Rosinska, Agata
    [J]. INTELLIGENT AND FUZZY SYSTEMS: DIGITAL ACCELERATION AND THE NEW NORMAL, INFUS 2022, VOL 1, 2022, 504 : 319 - 327
  • [22] A New Method for Fuzzy Critical Path Analysis in Project Networks with a New Representation of Triangular Fuzzy Numbers
    Kumar, Amit
    Kaur, Parmpreet
    [J]. APPLICATIONS AND APPLIED MATHEMATICS-AN INTERNATIONAL JOURNAL, 2010, 5 (02): : 345 - 369
  • [23] Project Delay as A Consequence of Project Activities Start Times Delays - Fuzzy Approach
    Gladysz, Barbara
    Kuchta, Dorota
    [J]. EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT: A 2025 VISION TO SUSTAIN ECONOMIC DEVELOPMENT DURING GLOBAL CHALLENGES, 2020, : 16749 - 16760
  • [24] Limited Resources Project Management Research Based on Critical Paths
    Liu, Xueyan
    Li, Cunbin
    [J]. 2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5153 - 5156
  • [25] Applying Social Network Analysis to Identify Project Critical Success Factors
    Nunes, Marco
    Abreu, Antonio
    [J]. SUSTAINABILITY, 2020, 12 (04)
  • [26] Critical Review of Social Network Analysis Applications in Complex Project Management
    Lee, Cen-Ying
    Chong, Heap-Yih
    Liao, Pin-Chao
    Wang, Xiangyu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)
  • [27] Finding multiple possible critical paths using fuzzy PERT
    Chen, SM
    Chang, TH
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2001, 31 (06): : 930 - 937
  • [28] Modeling and Analysis Method of Nondeterministic Activity Network in Linear Project
    Zhang, Jiuhui
    Liu, Zhenyuan
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 5303 - 5308
  • [29] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network
    V. Sireesha
    N. Ravi Shankar
    [J]. Computational and Applied Mathematics, 2018, 37 : 1971 - 1985
  • [30] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network
    Sireesha, V
    Shankar, N. Ravi
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (02): : 1971 - 1985