Modeling and Analysis Method of Nondeterministic Activity Network in Linear Project

被引:0
|
作者
Zhang, Jiuhui [1 ]
Liu, Zhenyuan [1 ,2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Artificial Intelligence & Automat, Wuhan 430074, Peoples R China
[2] Key Lab Educ Minist Image Proc & Intelligent Cont, Wuhan 430074, Peoples R China
关键词
Nondeterministic Activity Network; Risk; Linear Project; Linear Scheduling Method; SCHEDULING METHOD;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a method of mapping linear project schedule to nondeterministic activity network is proposed in order to quantify the uncertainty of the Linear Scheduling Method schedule. Through this method, the nondeterministic activity network can be analyzed, and the schedule can be adjusted according to the result of risk prediction. This paper uses a highway construction project for the method verification. It has certain guiding significance to the risk management of the actual construction project.
引用
收藏
页码:5303 / 5308
页数:6
相关论文
共 12 条
  • [1] Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI 10.1016/j.hbrcj.2015.05.001
  • [2] Does risk management contribute to IT project success? A meta-analysis of empirical evidence
    de Bakker, Karel
    Boonstra, Albert
    Wortmann, Hans
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (05) : 493 - 503
  • [3] Linear scheduling model: Float characteristics
    Harmelink, DJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (04): : 255 - 260
  • [4] JOHNSTON DW, 1981, J CONSTRUCT DIV-ASCE, V107, P247
  • [5] Khodakarami V., 2007, PROJ MANAG J, V38, P39, DOI [https://doi.org/10.1177/875697280703800205, DOI 10.1177/875697280703800205]
  • [6] Bayesian analysis of data-worth considering model and parameter uncertainties
    Neuman, Shlomo P.
    Xue, Liang
    Ye, Ming
    Lu, Dan
    [J]. ADVANCES IN WATER RESOURCES, 2012, 36 : 75 - 85
  • [7] A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fifth Edition
    Rose, Kenneth H.
    [J]. PROJECT MANAGEMENT JOURNAL, 2013, 44 (03) : e1 - e1
  • [8] Scheduling Optimization of Linear Schedule with Constraint Programming
    Tang, Yuanjie
    Liu, Rengkui
    Wang, Futian
    Sun, Quanxin
    Kandil, Amr A.
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (02) : 124 - 151
  • [9] Two-Stage Scheduling Model for Resource Leveling of Linear Projects
    Tang, Yuanjie
    Liu, Rengkui
    Sun, Quanxin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
  • [10] Schedule control model for linear projects based on linear scheduling method and constraint programming
    Tang, Yuanjie
    Liu, Rengkui
    Sun, Quanxin
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 37 : 22 - 37