共 50 条
- [1] CRITICAL PATH METHOD - TECHNIQUE FOR PROJECT PLANNING [J]. MANAGEMENT CONTROLS, 1966, 13 (02): : 24 - 32
- [2] Implementation of Critical Path Method in Project Planning and Scheduling [J]. 2ND INTERNATIONAL CONFERENCE ON INFORMATICS, ENGINEERING, SCIENCE, AND TECHNOLOGY (INCITEST 2019), 2019, 662
- [4] Method of fuzzy critical path for network planning and control over projects based on soft computations [J]. Cybernetics and Systems Analysis, 1999, 35 : 479 - 490
- [6] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network [J]. Computational and Applied Mathematics, 2018, 37 : 1971 - 1985
- [7] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (02): : 1971 - 1985
- [8] FUZZY CRITICAL PATH METHOD [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1994, 24 (01): : 48 - 57
- [10] Determination Method of Critical Path in Fuzzy Network Planning Based on Improved Lattice Close-degree Theory [J]. ADVANCED RESEARCH ON AUTOMATION, COMMUNICATION, ARCHITECTONICS AND MATERIALS, PTS 1 AND 2, 2011, 225-226 (1-2): : 886 - +