Fuzzy activity times in critical path and project crashing problems

被引:0
|
作者
Liu, ST [1 ]
机构
[1] Van Nung Inst Technol, Grad Sch Business & Management, Tao Yuan 320, Taiwan
关键词
D O I
10.1080/01969720302865
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Program Evaluation and Review Technique (PERT) is extensively used in research and development projects. Closely associated with PERT is the problem of resource utilization to reduce project duration time. This article develops solution procedures for the critical path and the project crashing problems with fuzzy activity times in project planning. The idea is based on Yager's method to change the fuzzy formulation of the problem to a crisp problem. Due to the special structure of the project network, the conventional streamlined methods can be applied to find an optimal solution. The derived fuzzy completion time of the project indicates not only the most likely value, but also the range in which the completion time will appear. With the method proposed in this article, more information is provided for the project manager to make decisions.
引用
收藏
页码:161 / 172
页数:12
相关论文
共 50 条
  • [41] The critical path problem in an interval project network
    Liu, CL
    Shi, JJ
    [J]. MANAGEMENT SCIENCES AND GLOBAL STRATEGIES IN THE 21ST CENTURY, VOLS 1 AND 2, 2004, : 444 - 449
  • [42] Critical Path for a Grey Interval Project Network
    Song, Zhongmin
    Yan, Xizu
    [J]. ADVANCES IN GREY SYSTEMS RESEARCH, 2010, : 37 - 46
  • [44] CRITICAL PATH METHOD - TECHNIQUE FOR PROJECT PLANNING
    DEEKS, DJ
    REYNOLDS, AJ
    [J]. MANAGEMENT CONTROLS, 1966, 13 (02): : 24 - 32
  • [45] SOME REMARKS TO FUZZY CRITICAL PATH METHOD
    MARES, M
    [J]. EKONOMICKO-MATEMATICKY OBZOR, 1991, 27 (04): : 367 - 370
  • [46] Project Delay as A Consequence of Project Activities Start Times Delays - Fuzzy Approach
    Gladysz, Barbara
    Kuchta, Dorota
    [J]. EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT: A 2025 VISION TO SUSTAIN ECONOMIC DEVELOPMENT DURING GLOBAL CHALLENGES, 2020, : 16749 - 16760
  • [47] Fuzzy Critical Path Method Based on Lexicographic Ordering of Fuzzy Numbers
    Rao, P. Phani Bushan
    Shankar, N. Ravi
    [J]. PAKISTAN JOURNAL OF STATISTICS AND OPERATION RESEARCH, 2012, 8 (01) : 140 - U155
  • [48] Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method
    Castro-Lacouture, Daniel
    Suer, Gursel A.
    Gonzalez-Joaqui, Julian
    Yates, J. K.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1096 - 1104
  • [49] Critical events at critical times? A gendered identity approach on the path to (sustainable) leadership
    Gloor, Jamie L. L.
    Rehbock, Stephanie K. K.
    Kark, Ronit
    [J]. FRONTIERS IN PSYCHOLOGY, 2023, 13
  • [50] Implementation of Critical Path Method in Project Planning and Scheduling
    Atin, S.
    Lubis, R.
    [J]. 2ND INTERNATIONAL CONFERENCE ON INFORMATICS, ENGINEERING, SCIENCE, AND TECHNOLOGY (INCITEST 2019), 2019, 662