Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method

被引:43
|
作者
Castro-Lacouture, Daniel [1 ]
Suer, Gursel A. [2 ]
Gonzalez-Joaqui, Julian [3 ]
Yates, J. K. [4 ]
机构
[1] Georgia Inst Technol, Bldg Construct Program, Atlanta, GA 30332 USA
[2] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
[3] Bros Concrete Construct Inc, Vienna, VA USA
[4] Ohio Univ, Dept Civil Engn, Athens, OH 45701 USA
关键词
Construction management; Construction materials; Fuzzy sets; Multiple objective analysis; Optimization; Resource allocation; Scheduling;
D O I
10.1061/(ASCE)0733-9364(2009)135:10(1096)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article evaluates the viability of using fuzzy mathematical models for determining construction schedules and for evaluating the contingencies created by schedule compression and delays due to unforeseen material shortages. Networks were analyzed using three methods: manual critical path method scheduling calculations, Primavera Project Management software (P5), and mathematical models using the Optimization Programming Language software. Fuzzy mathematical models that allow the multiobjective optimization of project schedules considering constraints such as time, cost, and unexpected materials shortages were used to verify commonly used methodologies for finding the minimum completion time for projects. The research also used a heuristic procedure for material allocation and sensitivity analysis to test five cases of material shortage, which increase the cost of construction and delay the completion time of projects. From the results obtained during the research investigation, it was determined that it is not just whether there is a shortage of a material but rather the way materials are allocated to different activities that affect project durations. It is important to give higher priority to activities that have minimum float values, instead of merely allocating materials to activities that are immediately ready to start.
引用
收藏
页码:1096 / 1104
页数:9
相关论文
共 50 条
  • [1] A dynamic critical path method for project scheduling based on a generalised fuzzy similarity
    Liu, Dajiang
    Hu, Changming
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2021, 72 (02) : 458 - 470
  • [2] Project scheduling for constructing biogas plant using critical path method
    Zareei, Samira
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 81 : 756 - 759
  • [3] Implementation of Critical Path Method in Project Planning and Scheduling
    Atin, S.
    Lubis, R.
    [J]. 2ND INTERNATIONAL CONFERENCE ON INFORMATICS, ENGINEERING, SCIENCE, AND TECHNOLOGY (INCITEST 2019), 2019, 662
  • [4] Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling
    Kim, Kyunghwan
    [J]. SUSTAINABILITY, 2020, 12 (21) : 1 - 19
  • [5] Applications of Fuzzy Critical Chain Method in Project Scheduling
    Zhao, Zhen-Yu
    You, Wei-Yang
    Lv, Qian-Lei
    [J]. ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 6, PROCEEDINGS, 2008, : 473 - 477
  • [6] Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
    Rogalska, Magdalena
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 18 (01) : 24 - 31
  • [7] Sustainable Green City Development Project Analysis using the Critical Path Method (CPM) and the Crashing Project Method on Time and Cost Optimization
    Abuhasel, Khaled
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2023, 13 (03) : 10973 - 10977
  • [8] Scheduling evaluation in construction projects using the critical chain project management method
    Sembiring, N.
    Putra, A.
    [J]. INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [9] Mathematical Models and Method of Analysis of the Cost Extending Competence Using the Fuzzy Set
    Bachtadze, N.
    Zaikin, O.
    Zylawski, A.
    Nikulina, I.
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 876 - 881
  • [10] SOLVING FUZZY TIME-COST TRADE-OFF PROBLEM USING HAAR CRITICAL PATH METHOD OF OCTAGONAL FUZZY NUMBERS
    Rameshan, N.
    Dinagar, D. Stephen
    [J]. ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2021, 21 (02): : 907 - 922