SOLVING FUZZY TIME-COST TRADE-OFF PROBLEM USING HAAR CRITICAL PATH METHOD OF OCTAGONAL FUZZY NUMBERS

被引:0
|
作者
Rameshan, N. [1 ]
Dinagar, D. Stephen [1 ]
机构
[1] Bharathidasan Univ, TBML Coll, Dept Math, PG & Res, Porayar 609603, Tamil Nadu, India
来源
关键词
Octagonal fuzzy number; Critical path; Haar ranking;
D O I
暂无
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
The goal of this study is to present the octagonal fuzzy number (OCFN) in uncertain situations. The critical path method (CPM) is a significant role for project planning and control, especially for large and complex projects. The successful implementation of the CPM will be aided by a clear definition of time length. Time and cost are the most significant aspects to consider when designing a project. The goal of the project is to complete it on time, on budget, and to meet other objective of the project. However, in actual life, the length of time cannot be precisely specified. As a result, there is always a degree of ambiguity about the duration of activities, prompting the development of the fuzzy critical path technique. In this article, a wavelet-based ranking called Haar ranking for OCFN is used. The fuzzy parameters are first transformed to Haar tuples using the Haar wavelet approach, and then the critical path method is used to find the optimum cost and duration.
引用
收藏
页码:907 / 922
页数:16
相关论文
共 50 条
  • [1] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [2] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [3] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
  • [4] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [5] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [6] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [7] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [8] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [9] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    [J]. Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [10] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    [J]. APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85