Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method

被引:43
|
作者
Castro-Lacouture, Daniel [1 ]
Suer, Gursel A. [2 ]
Gonzalez-Joaqui, Julian [3 ]
Yates, J. K. [4 ]
机构
[1] Georgia Inst Technol, Bldg Construct Program, Atlanta, GA 30332 USA
[2] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
[3] Bros Concrete Construct Inc, Vienna, VA USA
[4] Ohio Univ, Dept Civil Engn, Athens, OH 45701 USA
关键词
Construction management; Construction materials; Fuzzy sets; Multiple objective analysis; Optimization; Resource allocation; Scheduling;
D O I
10.1061/(ASCE)0733-9364(2009)135:10(1096)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article evaluates the viability of using fuzzy mathematical models for determining construction schedules and for evaluating the contingencies created by schedule compression and delays due to unforeseen material shortages. Networks were analyzed using three methods: manual critical path method scheduling calculations, Primavera Project Management software (P5), and mathematical models using the Optimization Programming Language software. Fuzzy mathematical models that allow the multiobjective optimization of project schedules considering constraints such as time, cost, and unexpected materials shortages were used to verify commonly used methodologies for finding the minimum completion time for projects. The research also used a heuristic procedure for material allocation and sensitivity analysis to test five cases of material shortage, which increase the cost of construction and delay the completion time of projects. From the results obtained during the research investigation, it was determined that it is not just whether there is a shortage of a material but rather the way materials are allocated to different activities that affect project durations. It is important to give higher priority to activities that have minimum float values, instead of merely allocating materials to activities that are immediately ready to start.
引用
收藏
页码:1096 / 1104
页数:9
相关论文
共 50 条
  • [41] Critical Chain Design Structure Matrix Method for Construction Project Scheduling under Rework Scenarios
    Ma, Guofeng
    Hao, Keke
    Xiao, Yu
    Zhu, Tiancheng
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [42] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [43] Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
    Chiu, Singa Wang
    Chiu, Yuan-Shyi Peter
    Shih, Chih-Chang
    [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2006, 65 (09): : 695 - 701
  • [44] Developing Project Schedule in Telecommunication Projects Using Critical Path Method (CPM)
    Kusumadarma, Indri Alvi
    Pratami, Devi
    Yasa, I. Putu
    Tripiawan, Wawan
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2020, 12 (03): : 60 - 67
  • [45] IMPLEMENTATION PROJECT MANAGEMENT OF A ROBOTIC MANUFACTURING CELL USING THE CRITICAL PATH METHOD
    Indre, Claudiu-Ioan
    Blaga, Florin-Sandu
    Negrau, Dan-Claudiu
    Hule, Voichita Ionela
    Groza, Mihai-Dan
    [J]. ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2023, 66 (05): : 281 - 290
  • [46] Analysis of business networks in project management by using critical path method (CPM)
    Ahmad, Hasanain Hamid
    [J]. JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2020, 23 (04) : 851 - 855
  • [47] A GREY MULTI-OBJECTIVE LINEAR MODEL TO FIND CRITICAL PATH OF A PROJECT BY USING TIME, COST, QUALITY AND RISK PARAMETERS
    Mahdiraji, Hannan Amoozad
    Hajiagha, Seyed Hossein Razavi
    Hashemi, Shide Sadat
    Zavadskas, Edmundas Kazimieras
    [J]. E & M EKONOMIE A MANAGEMENT, 2016, 19 (01): : 49 - 61
  • [48] Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria
    Maghsoud Amiri
    Farhaneh Golozari
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 54 : 393 - 401
  • [49] Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria
    Amiri, Maghsoud
    Golozari, Farhaneh
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4): : 393 - 401
  • [50] A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets
    Dalouchei, Fatemeh
    Mousavi, Seyed Meysam
    Antucheviciene, Jurgita
    Minaei, Ahmad
    [J]. BUILDINGS, 2022, 12 (07)