共 50 条
- [42] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
- [43] Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2006, 65 (09): : 695 - 701
- [44] Developing Project Schedule in Telecommunication Projects Using Critical Path Method (CPM) [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2020, 12 (03): : 60 - 67
- [45] IMPLEMENTATION PROJECT MANAGEMENT OF A ROBOTIC MANUFACTURING CELL USING THE CRITICAL PATH METHOD [J]. ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2023, 66 (05): : 281 - 290
- [47] A GREY MULTI-OBJECTIVE LINEAR MODEL TO FIND CRITICAL PATH OF A PROJECT BY USING TIME, COST, QUALITY AND RISK PARAMETERS [J]. E & M EKONOMIE A MANAGEMENT, 2016, 19 (01): : 49 - 61
- [48] Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria [J]. The International Journal of Advanced Manufacturing Technology, 2011, 54 : 393 - 401
- [49] Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4): : 393 - 401