Fuzzy activity times in critical path and project crashing problems

被引:0
|
作者
Liu, ST [1 ]
机构
[1] Van Nung Inst Technol, Grad Sch Business & Management, Tao Yuan 320, Taiwan
关键词
D O I
10.1080/01969720302865
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Program Evaluation and Review Technique (PERT) is extensively used in research and development projects. Closely associated with PERT is the problem of resource utilization to reduce project duration time. This article develops solution procedures for the critical path and the project crashing problems with fuzzy activity times in project planning. The idea is based on Yager's method to change the fuzzy formulation of the problem to a crisp problem. Due to the special structure of the project network, the conventional streamlined methods can be applied to find an optimal solution. The derived fuzzy completion time of the project indicates not only the most likely value, but also the range in which the completion time will appear. With the method proposed in this article, more information is provided for the project manager to make decisions.
引用
收藏
页码:161 / 172
页数:12
相关论文
共 50 条
  • [31] Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times
    Huang, Wei
    Ding, Lixin
    Wen, Bin
    Cao, Buqing
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS, 2009, 5552 : 60 - 69
  • [32] A stochastic branch-and-bound approach to activity crashing in project management
    Gutjahr, WJ
    Strauss, C
    Wagner, E
    [J]. INFORMS JOURNAL ON COMPUTING, 2000, 12 (02) : 125 - 135
  • [33] Critical Path for Projects with Activity Durations Modelled as Z-Fuzzy Numbers
    Ewa, Marchwicka
    Dorota, Kuchta
    [J]. JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2022, 39 (5-6) : 539 - 559
  • [34] Study of fuzzy critical path method
    Jin, Y
    Nan, YR
    Xu, XX
    Hu, JS
    Wu, TZ
    [J]. PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 159 - 166
  • [35] Critical Path Analysis with Imprecise Activities Times
    Chwastyk, Anna
    Pisz, Iwona
    [J]. VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT AND APPLICATION OF INNOVATION MANAGEMENT, 2018, : 2004 - 2013
  • [36] Reinforcement Learning for Resource Constrained Project Scheduling Problem with Activity Iterations and Crashing
    Sung, Inkyung
    Choi, Bongjun
    Nielsen, Peter
    [J]. IFAC PAPERSONLINE, 2020, 53 (02): : 10493 - 10497
  • [37] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network
    V. Sireesha
    N. Ravi Shankar
    [J]. Computational and Applied Mathematics, 2018, 37 : 1971 - 1985
  • [38] A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network
    Sireesha, V
    Shankar, N. Ravi
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (02): : 1971 - 1985
  • [39] On fuzzy shortest path problems with fuzzy parameters: an algorithmic approach
    Takahashi, MT
    Yamakami, A
    [J]. NAFIPS 2005 - 2005 ANNUAL MEETING OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY, 2005, : 654 - 657
  • [40] PROJECT-MANAGEMENT - SHORTENING THE CRITICAL PATH
    IZUCHUKWU, JI
    [J]. MECHANICAL ENGINEERING, 1990, 112 (02): : 59 - 60