Productivity Measurement and Improvement for Public Construction Projects

被引:2
|
作者
Zhan, Wenting [1 ]
Pan, Wei [2 ]
Hao, Gang [3 ]
机构
[1] Zhejiang Shuren Univ, Sch Management, Dept Publ Adm, Shuren Rd, Hangzhou 310015, Zhejiang, Peoples R China
[2] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Hong Kong, Peoples R China
关键词
Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function; PERFORMANCE-MEASUREMENT; MANAGEMENT; FRAMEWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0002282
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Contractor process improvement for enhancing construction productivity
    Cottrell, DS
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 189 - 196
  • [42] Appropriate Exertion of Public Opinion Supervision in Public Construction Projects
    Wang, Liguo
    Han, Aijin
    ICEEM 2012: 2012 2ND INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT, VOL 2, 2012, : 185 - 189
  • [43] Effect of systematic completion on public construction projects
    Beste, Teresa
    FACILITIES, 2021, 39 (3-4) : 156 - 171
  • [44] SURETY BONDS ON PUBLIC AND PRIVATE CONSTRUCTION PROJECTS
    CUSHMAN, EH
    AMERICAN BAR ASSOCIATION JOURNAL, 1960, 46 (06): : 649 - 654
  • [45] Computer images: Visualisation of public construction projects
    Emery, M
    ARCHITECTURE D AUJOURD HUI, 1999, 321 : 119 - 119
  • [46] Assessing the adequacy of competition in public construction projects
    Hyari, Khaled Hesham
    Thneibat, Mujahed
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [47] Cost development in Norwegian public construction projects
    Danielsen, Daniel Andre
    Torp, Olav
    Engebo, Atle
    Laedre, Ola
    Lohne, Jardar
    PROCEEDINGS OF THE 9TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2017, : 79 - 92
  • [48] Responsibility mechanism for agent construction of public projects
    Zhang, Wei
    Zhu, Hongliang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2008, 41 (12): : 103 - 107
  • [49] Causes of Delay in Public Construction Projects in Iraq
    Bekr, Ghanim A.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2015, 9 (02) : 149 - 162
  • [50] Measuring Corruption in Public Construction Projects in China
    Shan, Ming
    Chan, Albert P. C.
    Le, Yun
    Xia, Bo
    Hu, Yi
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2015, 141 (04)