Productivity Measurement and Improvement for Public Construction Projects

被引:2
|
作者
Zhan, Wenting [1 ]
Pan, Wei [2 ]
Hao, Gang [3 ]
机构
[1] Zhejiang Shuren Univ, Sch Management, Dept Publ Adm, Shuren Rd, Hangzhou 310015, Zhejiang, Peoples R China
[2] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Hong Kong, Peoples R China
关键词
Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function; PERFORMANCE-MEASUREMENT; MANAGEMENT; FRAMEWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0002282
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Impact of labour productivity in estimating the duration of construction projects
    Selvam, Gopinath
    Madhavi, T. Ch.
    Naazeema Begum, T. P.
    Sudheesh, Monish
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2398 - 2404
  • [32] Towards improving construction labor productivity and projects' performance
    Shehata, Mostafa E.
    El-Gohary, Khaled M.
    ALEXANDRIA ENGINEERING JOURNAL, 2011, 50 (04) : 321 - 330
  • [33] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116
  • [34] Productivity monitoring in building construction projects: a systematic review
    Alaloul, Wesam Salah
    Alzubi, Khalid M.
    Malkawi, Ahmad B.
    Al Salaheen, Marsail
    Musarat, Muhammad Ali
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2760 - 2785
  • [35] On-site construction productivity in Malaysian infrastructure projects
    Durdyev, Serdar
    Ismail, Syuhaida
    STRUCTURAL SURVEY, 2016, 34 (4-5) : 446 - 462
  • [36] Twinning motivation, productivity and management strategy in construction projects
    Doloi, Hemanta
    ENGINEERING MANAGEMENT JOURNAL, 2007, 19 (03) : 30 - 40
  • [37] AN IMPROVEMENT OF THE INFORMATION SCOPE OF PROJECTS FOR WELL CONSTRUCTION
    OBIDNOV, BI
    PILYUTSKII, OV
    MAKSIMOVA, TN
    NEFTYANOE KHOZYAISTVO, 1983, (10): : 7 - 10
  • [38] Measurement of green productivity and its improvement
    Hur, T
    Kim, I
    Yamamoto, R
    JOURNAL OF CLEANER PRODUCTION, 2004, 12 (07) : 673 - 683
  • [39] Offsite Manufacturing in the Construction Industry for Productivity Improvement
    Durdyev, Serdar
    Ismail, Syuhaida
    ENGINEERING MANAGEMENT JOURNAL, 2019, 31 (01) : 35 - 46
  • [40] CONSTRUCTION PRODUCTIVITY IMPROVEMENT - HOW TO GET STARTED
    HOWELL, G
    CIVIL ENGINEERING, 1981, 51 (08): : 52 - 54