Productivity Measurement and Improvement for Public Construction Projects

被引:2
|
作者
Zhan, Wenting [1 ]
Pan, Wei [2 ]
Hao, Gang [3 ]
机构
[1] Zhejiang Shuren Univ, Sch Management, Dept Publ Adm, Shuren Rd, Hangzhou 310015, Zhejiang, Peoples R China
[2] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Hong Kong, Peoples R China
关键词
Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function; PERFORMANCE-MEASUREMENT; MANAGEMENT; FRAMEWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0002282
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Towards Effective Productivity Measurement in Software Projects
    de Aquino Junior, Gibeon Soares
    de Lemos Meira, Silvio Romero
    [J]. 2009 FOURTH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING ADVANCES (ICSEA 2009), 2009, : 241 - 249
  • [22] Identification of construction productivity components in Indonesia. Case study of construction projects at the ministry of public works and housing provision (PUPR)
    Anditiaman, N. M.
    Latief, R. U.
    Rahim, I. R.
    Arifuddin, R.
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2019), 2020, 419
  • [23] A Success Measurement Model for Construction Projects
    Khosravi, Shahrzad
    Afshari, Hamidreza
    [J]. Financial Management and Economics, ICFME 2011, 2011, 11 : 186 - 190
  • [24] Automating progress measurement of construction projects
    Zhang, Xiaonan
    Bakis, Nick
    Lukins, Timothy C.
    Ibrahim, Yahaya M.
    Wu, Song
    Kagioglou, Mike
    Aouad, Ghassan
    Kaka, Ammar P.
    Trucco, Emanuele
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (03) : 294 - 301
  • [25] Health and safety improvement in construction projects: a lean construction approach
    Abu Aisheh, Yazan Issa
    Tayeh, Bassam A.
    Alaloul, Wesam Salah
    Almalki, Ali
    [J]. INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (04) : 1981 - 1993
  • [26] Trust and productivity in Australian construction projects: a subcontractor perspective
    Chalker, Mathew
    Loosemore, Martin
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (02) : 192 - 210
  • [27] Impact of labour productivity in estimating the duration of construction projects
    Selvam, Gopinath
    Madhavi, T. Ch.
    Naazeema Begum, T. P.
    Sudheesh, Monish
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2398 - 2404
  • [28] Towards improving construction labor productivity and projects' performance
    Shehata, Mostafa E.
    El-Gohary, Khaled M.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2011, 50 (04) : 321 - 330
  • [29] Productivity monitoring in building construction projects: a systematic review
    Alaloul, Wesam Salah
    Alzubi, Khalid M.
    Malkawi, Ahmad B.
    Al Salaheen, Marsail
    Musarat, Muhammad Ali
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2760 - 2785
  • [30] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116