Identification of construction productivity components in Indonesia. Case study of construction projects at the ministry of public works and housing provision (PUPR)

被引:2
|
作者
Anditiaman, N. M. [1 ]
Latief, R. U. [1 ]
Rahim, I. R. [1 ]
Arifuddin, R. [1 ]
机构
[1] Univ Hasanuddin, Fac Engn, Dept Civil Engn, Makassar, Indonesia
关键词
D O I
10.1088/1755-1315/419/1/012146
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The problem faced by Indonesia at this time is the lack of information related to supply and demand related to the productivity component, so it needs a study to formulate an index of construction productivity in Indonesia. The analysis of the determination of the productivity component is carried out by the desk study approach with the standard of construction productivity calculation, the standard for construction work financing, and mapping analysis approach based on project technical document data from 3 Unor, namely Water Resources, Highways, and Cipta Karya. The mapping analysis results obtained that the Workforce Component consists of Experts, Skilled Workers, and Non-Skilled Workers, Work Equipment Components include heavy equipment and light equipment and Construction Material Components. Experts for Unor Water Resources consist of Water Resources Experts, Quality Management System, and K3 Construction, Unor Bina Marga, namely Road Engineering, Bridge Engineering, Quality Management System and OHS Construction. Unor Cipta Karya's experts consist of Environmental and Sanitation Engineering, Environmental Sanitation, Project Management, and Construction Management Experts. Skilled Workers from 3 Unor, namely Supervisors, Measurers, Land Mapping, Road Implementers/Irrigation, and K3 Officers. Non-skilled personnel consist of administrative and financial staff.
引用
收藏
页数:8
相关论文
共 26 条
  • [1] Factors affecting performance at the Iraqi Construction Projects, Ministry of Construction, and Housing and Municipalities and Public Works of Iraq as a case study
    Mahmoud A.H.
    [J]. Asian Journal of Civil Engineering, 2020, 21 (1) : 105 - 118
  • [2] Enterprise Architecture Design for Construction Services Using The Open Group Architecture Framework (TOGAF): Case Study Ministry of Public Works and Housing, Indonesia
    Palupi, Atina Dwi
    Hambali
    Fauzan
    Surosa, Reni Maulidina
    [J]. 2018 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY SYSTEMS AND INNOVATION (ICITSI), 2018, : 66 - 71
  • [3] Institutional Transformation of Public Private Partnership to Ensure Low Transaction Costs: Case Study of Infrastructure Provision at the Ministry of Public Works and Housing of the Republic of Indonesia
    Yolanda Indah Permatasari
    Sudarsono Hardjosoekarto
    Roy Valiant Salomo
    [J]. Systemic Practice and Action Research, 2020, 33 : 149 - 165
  • [4] Institutional Transformation of Public Private Partnership to Ensure Low Transaction Costs: Case Study of Infrastructure Provision at the Ministry of Public Works and Housing of the Republic of Indonesia
    Permatasari, Yolanda Indah
    Hardjosoekarto, Sudarsono
    Salomo, Roy Valiant
    [J]. SYSTEMIC PRACTICE AND ACTION RESEARCH, 2020, 33 (02) : 149 - 165
  • [5] A Study on Claim/Dispute Management Provisions in Japanese Public Construction Works and ODA Construction Projects
    Niraula, Rajendra
    Kusayanagi, Shunji
    [J]. IFOST: 2007 INTERNATIONAL FORUM ON STRATEGIC TECHNOLOGY, 2007, : 255 - +
  • [6] Improving Performance in Construction Projects: A Case Study of Malaysian Public Projects
    Yusof, Aminah Md
    Khoso, Ali Raza
    Sohu, Samiullah
    Khahro, Shabir Hussain
    Chai, Chang Saar
    [J]. PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (04): : 2579 - 2604
  • [7] Productivity Metrics and Its Implementations in Construction Projects: A Case Study of Singapore
    Shan, Ming
    Li, Yu-Shan
    Hwang, Bon-Gang
    Chua, Jia-En
    [J]. SUSTAINABILITY, 2021, 13 (21)
  • [8] Public participation performance in public construction projects of South China: A case study of the Guangzhou Games venues construction
    Xie, Lin-lin
    Xia, Bo
    Hu, Yi
    Shan, Ming
    Le, Yun
    Chan, Albert P. C.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (07) : 1391 - 1401
  • [10] PROPOSAL TO IMPROVE PRODUCTIVITY IN THE CONSTRUCTION PROJECTS. STUDY CASE MAXPLOT S.A. COMPANY
    Sellan, Neyva Astudillo
    Quezada-Torres, Walter David
    [J]. REVISTA UNIVERSIDAD Y SOCIEDAD, 2024, 16 (02): : 491 - 497