Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction

被引:7
|
作者
Tummalapudi, Manideep [1 ]
Harper, Christofer M. [1 ]
Taylor, Timothy R. B. [2 ]
Waddle, Steve [3 ]
Catchings, Rachel [3 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] Univ Kentucky, Dept Civil Engn, Lexington, KY USA
[3] Kentucky Transportat Ctr, Lexington, KY USA
关键词
infrastructure; construction; construction management; project close-out;
D O I
10.1177/03611981221087229
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
引用
收藏
页码:479 / 490
页数:12
相关论文
共 50 条
  • [31] Causes of delays in construction projects: A statistical analysis and model
    Zhao, Zhen Yu
    Liu, Rui
    Ning, Qing
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 944 - 952
  • [32] Causes of Construction Delays in Countries with High Geopolitical Risks
    Kadry, Mohamed
    Osman, Hesham
    Georgy, Maged
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (02)
  • [33] Causes of delays in construction projects in the Province of Aceh, Indonesia
    Rauzana, Anita
    Dharma, Wira
    PLOS ONE, 2022, 17 (01):
  • [34] Critical chain project management for a highway construction project with a focus on theory of constraints
    Sarkar, Debasis
    Jha, K. N.
    Patel, Shraddha
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (02) : 194 - 207
  • [35] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [36] Quantifying sustainable strategies for the construction of highway pavements in Illinois
    Ozer, Hasan
    Yang, Rebekah
    Al-Qadi, Imad L.
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2017, 51 : 1 - 13
  • [37] Managing Financial Implications for Sustainable Highway Project Delivery
    Goh, Kaichen
    Yang, Jay
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 347 - 352
  • [38] Construction delays stressing Vogtle project's economics
    Tampa
    FL, United States
    ENR, 25
  • [39] Investigation of Project Delays: Towards a Sustainable Construction Industry
    Memon, Aftab Hameed
    Memon, Abdul Qadir
    Khahro, Shabir Hussain
    Javed, Yasir
    SUSTAINABILITY, 2023, 15 (02)
  • [40] Managing supply chain risks and delays in construction project
    Panova, Yulia
    Hilletofth, Per
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2018, 118 (07) : 1413 - 1431