Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction

被引:7
|
作者
Tummalapudi, Manideep [1 ]
Harper, Christofer M. [1 ]
Taylor, Timothy R. B. [2 ]
Waddle, Steve [3 ]
Catchings, Rachel [3 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] Univ Kentucky, Dept Civil Engn, Lexington, KY USA
[3] Kentucky Transportat Ctr, Lexington, KY USA
关键词
infrastructure; construction; construction management; project close-out;
D O I
10.1177/03611981221087229
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
引用
收藏
页码:479 / 490
页数:12
相关论文
共 50 条
  • [21] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [22] Causes and effects of delays in Malaysian construction industry
    Sambasivan, Murali
    Soon, Yau Wen
    International Journal of Project Management, 2007, 25 (05) : 517 - 526
  • [23] Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
    Anastasopoulos, Panagiotis Ch.
    Labi, Samuel
    Bhargava, Abhishek
    Mannering, Fred
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (03) : 390 - 398
  • [24] An investigation into factors causing delays in highway construction projects in iraq
    Al Hadithi, Bevian I.
    3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [25] Research on Owner Project Management Maturity Model of Highway Construction Project
    Ren, Yaxi
    Jia, Yuanhua
    PROCEEDINGS OF THE 2017 5TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING (ICMMCCE 2017), 2017, 141 : 466 - 470
  • [26] The root causes of construction project failure
    Shahhosseini, V
    Afshar, M. R.
    Amiri, O.
    SCIENTIA IRANICA, 2018, 25 (01) : 93 - 108
  • [27] Augmented Reality Technology for Highway Construction Project Delivery
    Korkmaz, Kasim A.
    Tanbour, Emad Y. H.
    PROCEEDINGS OF 2018 10TH INTERNATIONAL CONFERENCE ON COMPUTER AND AUTOMATION ENGINEERING (ICCAE 2018), 2018, : 31 - 35
  • [28] Project Delivery Selection Matrix for Highway Design and Construction
    Tran, Dai Q.
    Harper, Christofer M.
    Molenaar, Keith R.
    Haddad, Nabil F.
    Scholfield, Mark M.
    TRANSPORTATION RESEARCH RECORD, 2013, (2347) : 3 - 10
  • [29] Analysis of Quality Control Measures in Highway Project Construction
    Yang, Huakui
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING, 2016, 54 : 289 - 293
  • [30] Causes of delays in the construction phase of Chinese building projects
    Wang, Ting-Kwei
    Ford, David N.
    Chong, Heap-Yih
    Zhang, Wei