Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction

被引:7
|
作者
Tummalapudi, Manideep [1 ]
Harper, Christofer M. [1 ]
Taylor, Timothy R. B. [2 ]
Waddle, Steve [3 ]
Catchings, Rachel [3 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] Univ Kentucky, Dept Civil Engn, Lexington, KY USA
[3] Kentucky Transportat Ctr, Lexington, KY USA
关键词
infrastructure; construction; construction management; project close-out;
D O I
10.1177/03611981221087229
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
引用
收藏
页码:479 / 490
页数:12
相关论文
共 50 条
  • [41] Rural Residents' Perception of Construction Project Delays in Pakistan
    Hussain, Shahid
    Zhu, Fangwei
    Ali, Zaigham
    Xu, Xiaohang
    SUSTAINABILITY, 2017, 9 (11)
  • [42] Sonoran synergy (The Beeline-Highway construction project in Arizona)
    Ingley, K
    LANDSCAPE ARCHITECTURE, 1999, 89 (04): : 44 - +
  • [43] Latent class analysis for highway design and construction project categorization
    Antoine, Arthur L. C.
    Molenaar, Keith R.
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 1314 - 1321
  • [44] Identify Best Practices of Project Bundling for Highway Construction Projects
    Shrestha, Saurav
    Shan, Yongwei
    Goodrum, Paul M.
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 1 - 9
  • [45] Model for sorting partners in construction: a case study in a highway project
    Silva, A. C. C. L. M.
    Alencar, L. H.
    2019 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2019, : 1518 - 1523
  • [46] Research on Incentive Mechanisms of Cyclic Economy for Highway Project Construction
    Yuan Chi
    Du Xiaoting
    INTERNATIONAL WORKSHOP ON ENERGY AND ENVIRONMENT IN THE DEVELOPMENT OF SUSTAINABLE ASPHALT PAVEMENTS, PROCEEDINGS, 2010, : 97 - 100
  • [47] Research on overall process environmental management of highway construction project
    School of Environmental Science and Engineering, Chang'an University, Xi'an 710064, China
    Zongguo Gonglu Xuebao, 2008, 1 (100-105):
  • [48] Developing and validating a tool to estimate highway construction project costs
    Kyte, CA
    Perfater, MA
    Haynes, S
    Lee, HW
    TRANSPORTATION MANAGEMENT AND PUBLIC POLICY 2004, 2004, (1885): : 35 - 41
  • [49] The Influence of Pavement Construction on Embankment Settlement in Highway Extension Project
    Wei, Xianlin
    Wang, Yimin
    Zeng, Zemin
    Zhang, Luo
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1787 - 1793
  • [50] Study on safety risk warning index for highway construction project
    Peng, Jianhua
    PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURAL AND HYDRAULIC ENGINEERING (ICCAHE 2016), 2016, 95 : 934 - 938