Investigation of Project Delays: Towards a Sustainable Construction Industry

被引:9
|
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Khahro, Shabir Hussain [2 ]
Javed, Yasir [3 ]
机构
[1] Quaid E Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah 67480, Pakistan
[2] Prince Sultan Univ, Coll Engn, Dept Engn Management, Riyadh 11586, Saudi Arabia
[3] Prince Sultan Univ, Coll Comp Informat & Sci, Dept Comp Sci, Riyadh 11586, Saudi Arabia
关键词
delays; project time overruns; construction industry; PLS-SEM; structural equation modeling; developing countries; MANAGEMENT; MODEL;
D O I
10.3390/su15021457
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry is one of the key industries for any country. It has been observed that this industry is suffering from sustainable solutions during project execution. It is evident from the literature that most of the construction projects are seriously affected by delays. Pakistan's construction industry also suffers similar challenges. After the COVID-19 pandemic, the construction industry is experiencing several challenges which have resulted in project delays. Thus, this study investigates the key challenges affecting the timely completion of construction projects. The challenges were discovered from the literature and investigated to analyze their significance towards a sustainable construction project. This study also observes the relationships between the key challenges using Partial Least Squares Structural Equation Modeling (PLS-SEM). A structural model was developed based on the 55 common challenges identified from literature. Data collection was administered through a structured questionnaire survey using a 5-point Likert-scale. The challenges were grouped into six constructs. The outcome reported 20 critical challenges, with information and communication-related factors being the most important challenge in the construction industry. Contract management also significantly affects project time overrun. The created model served as a starting point for academics, researchers, and practitioners to create an effective system for regulating time overrun challenges.
引用
收藏
页数:17
相关论文
共 50 条