Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals

被引:10
|
作者
Liu, Wenqian [1 ]
Zhu, Xiaoning [1 ]
Wang, Li [1 ]
Yan, Baicheng [1 ]
Zhang, Xuewei [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] China Commun Informat Technol Grp Co LTD, Beijing 100088, Peoples R China
关键词
ALGORITHMS; BERTH;
D O I
10.1155/2021/5537114
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the core operational issue in container terminals, yard crane scheduling problem directly affects the overall operation efficiency of port connecting highway or railway transportation and sea transportation. In practice, the scheduling of yard cranes is subject to many uncertain factors, so the scheme may be inapplicable and needs to be adjusted. From the perspective of proactive strategy, considering fluctuations in arrival time of external trucks as well as varied handling volume of yard cranes, a stochastic programming model is established in this paper to obtain a fixed scheme with the minimum expected value of yard crane makespan and total task waiting time over all the scenarios. The scheme does not require rescheduling when facing different situations. Subsequently, two algorithms based on certain rules are proposed to obtain the yard crane operation scheme in the deterministic environment, which are taken as the basic solution in the uncertain conditions, and then a tailored genetic algorithm is adopted to find the optimal solution with good adaptability to the uncertain scenarios. Finally, we use small-scale examples to compare the performance of algorithms in the deterministic and uncertain environment and then analyze the relationship between different yard crane configurations and the number of tasks. Large-scale experiments are performed to study the operation efficiency of the storage yard with different handling volumes assigned to each yard crane.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [42] Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
    Hsu, Hsien-Pin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Dang, Thanh-Tuan
    MATHEMATICS, 2021, 9 (18)
  • [43] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [44] Optimization Research of Joint Quay Crane Scheduling and Block Selection in Container Terminals
    Chen Xiazhong
    Zhang Ye
    Hu Hongtao
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [45] Integrating optimization method for continuous berth and quay crane scheduling in container terminals
    Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):
  • [46] Optimization of Gantry Crane Scheduling in Container Sea-Rail Intermodal Transport Yard
    Luo, Tian
    Chang, Daofang
    Gao, Yinping
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [47] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [48] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [49] A SIMULATION BASED HYBRID ALGORITHM FOR YARD CRANE DISPATCHING IN CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2230 - 2241
  • [50] YARD CRANE DISPATCHING TO MINIMIZE VESSEL TURNAROUND TIMES IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Guo, Xi
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1747 - 1758